- 7 -
ZMI
_001_
2030
0194
80-A
T
3O
0039
_#SE
N
_#AQ
U
_#V2
.f
m
12.1
Only for water connection from the rear: Install the connection brackets (a) leak-tight.
12.2
Screw in the water volume regulators (b) leak-tight.
12.3
Align the water volume regulators so that the locking screw and operating element
are freely accessible.
12.4
For a shower head height of 2.10 m to 2.30 m, mark drill holes for installation at a
height (c) of 2.14 m to 2.34 m from the top of the finished floor.
12.5
Drill holes in accordance with these markings.
12.6
Insert the wall plugs.
12.7
Screw on the suspension rail.
12.8
Suspend the shower panel.
12.9
Mark the remaining drill holes.
12.10
Remove the shower panel.
12.11
Drill holes in accordance with these markings.
Insert the wall plugs.
12.12
Remove the protective film from the shower panel.
12.13
Seal the shower panel (e.g. with Chromol, not part of the scope of delivery, see
Accessories,
).
Install the electrical T-distributor
☞
Important!
The components of the electrical T-distributor may only be installed after the power
has been switched off.
☞
Recommended system cable see
, accessories.
When using cables other than the system cable, pay attention to the different colour
code. The outer diameter must not exceed 7.5 mm.
12.14
Remove the sheathing (d) of the system cable (approx. 40 mm).
12.15
Push the cap nut (f) onto the system cable (w) up to the limit stop.
☞
The various wire guides are marked with numbers 1 to 4.
12.16
Push the wires (g) into the wire guides (h) according to their colours.
12.17
Cut off the projecting wire ends flush, i.e. without protrusions.
12.18
Push the union nut (f) onto the electrical T-distributor (i) and tighten it to the required
torque (1.2 Nm).
A: Union nut
B: FAR-Best.-Nr. 2000104272
FAR-Best.-Nr. 2000104274
FAR-Best.-Nr. 2000100801
FAR-Best.-Nr. 2000100852
A
B
1
brown
red
2
white
white
3
blue
blue
4
black
black