7
ZMI
_001_
2000
1038
01-A
Q
CT0029
_#SE
N
_#AQ
U
_#V
1.f
m
☞
Important!
Prior to the assembly process, flush the pipework in accordance with DIN 1988.
☞
To protect the tiles, use masking tape when marking and drilling. Drill at low speed.
☞
Depending on the composition of the wall, special wall plugs may have to be used
(to be provided by the customer).
Fig. A: Water connection from above
Fig. B: Water connection from rear
11.1
Only for water connection from the rear: Install the connection bracket (a) leak-tight.
11.2
Screw in the water volume regulator (b) leak-tight.
11.3
Align the water volume regulator so that the locking screw and operating element
are freely accessible.
11.4
For a shower head height of 2.10 m to 2.30 m, mark drill holes for installation at
a height (c) of 2.12 m to 2.32 m from the upper edge of the finished floor.
11.5
Drill holes in accordance with these markings.
11.6
Insert the wall plugs.
11.7
Screw on the suspension rail.
11.8
Suspend the shower panel.
11.9
Mark the remaining drill hole.
11.10
Remove the shower panel.
11.11
Drill holes in accordance with the markings.
11.12
Insert the wall plugs
☞
The battery compartment or power supply and extension cable are not part of the
scope of delivery (see Accessories,
☞
If you are using a wall-mounted power supply unit, it must be installed around 3 m
away from the shower.
11.13
Connect the AQUACONTACT sensor (f) to
– a battery compartment (d)
or
– a wall-mounted power supply unit (e).
☞
If the battery charge state is low, the LED flashes in a 20s cycle.
11.14
Only for water connection from the rear: Prioritise work steps 11.16 to 11.18.
11.15
Mount the shower panel on the suspension rail and screw tight.
11.16
Establish the water connections.
11.17
Open the water volume regulators using a hexagonal wrench.
g: closed
h: open
11.18
Check the water connections for leaks.