Framery 2Q Huddle
3.
Install the bracket with the control unit into the back opening in the ceiling with 3x12
mm screws (2 pcs).
Note:
Install the control unit on the right-hand side of the roof beam.
4.
Connect the DC extension cord to the PWR IN connector of the control unit.
Installation instructions
[email protected]
91