Framery 2Q Huddle
7.
Connect the 5V unit to the PWR IN connector of the control unit.
8.
Place the 5V unit carefully on the ceiling felt between the ceiling beams.
10.4 Install the side glasses
Note:
If the delivery includes the booking system bracket, go to step 3.
84
Installation instructions
[email protected]