
3
8 Main menu
36
8.1 PQC initial start-up
37
8.1.1 Language selection on start-up
37
8.1.2 Start-up
39
8.2 PQC overview
39
8.2.1 Displayed parameters
40
8.3 Control diagram
41
8.3.1 Scale
41
8.4 Manual control
42
8.4.1 Stages menu
43
8.5 Settings
44
8.5.1 Settable control profiles
44
8.5.2 Typical control profile applications
45
8.5.2.1 Setting target cos
φ
46
8.5.2.2 Parallel shift
47
8.5.2.3 Limitation L
48
8.5.2.4 Switching delay
50
8.5.2.5 Selecting the control phase
50
8.5.3 General settings
50
8.5.3.1 Capacitor stages menu
51
8.5.3.2 Setting alarm limits
52
8.5.3.2.1 Overcurrent
53
8.5.3.2.2 Detection of voltage blackout (sag)
53
8.5.3.3 Alarm management
54
8.5.3.4 Optional Modbus RTU interface
55
8.5.3.5 Factory settings
56
8.5.3.6 Password protection
56
8.6 Info / status
57
8.6.1 PQC status
58
8.6.2 Corrective power
58
8.6.3 Capacitor stages table
59
8.6.4 Capacitor stages rating diagram
59
8.6.5 Switch cycle diagram
59
8.6.6 Voltage and current harmonics diagram
60
8.6.7 Voltage and current harmonics table
60
8.6.8 Manual frequency analysis
61
8.7 About PQC submenu
61
8.8 Factory default settings
62
8.9 Update
64
9 Instrument versions
65
10 Maintenance
66
10.1 Cleaning
66
11 Decommissioning and removal, storage and disposal
67
11.1 Decommissioning and removal
67
11.2 Storage
69
11.3 Disposal
69
12 General operation
69
12.1 Troubleshooting
70
13 Scope of supply
71