Summary of Contents for 618 192

Page 1: ...il info fpm agromehanika rs tel Sales 381 0 30 463 455 463 356 tel Service 381 0 30 463 619 fax 381 0 30 463 405 http www fpm agromehanika rs SIDE PLANT RESIDUE SHREDDER MULCHER with hydraulic arm FPM...

Page 2: ...s and vineyards and servicing These parts are manufactured and carefully examined in the same factory where the mulchers are manufactured to ensure high quality and precise fitting for each replacemen...

Page 3: ...AND IMPORTANT REFER TO SPECIAL INSTRUCTIONS RELATED TO THE SAFETY OF TRACTOR PLANT RESIDUE SHREDDER MULCHER Warning to you user Personal safety ____________________________________ 3 Warranty limitat...

Page 4: ...cardan shaft shaft guards hydro cylinder with connecting hoses etc These items are not covered by this warranty but by the warranty of the corresponding producers 3 Parts that are normally worn durin...

Page 5: ...ns in the Manual The labels must be clearly visible and legible otherwise replace them with the new ones ___________________________________________________________________________________________ Ide...

Page 6: ...CARDAN SHAFT AND THE TRACTOR ROTATING ELEMENTS Keep your feet from rotating parts Turn off the tractor and cardan shaft BEFORE STARTING ADJUSTMENT LUBRICATION OR CLEANING OF THE TOOL TURN OFF THE TRA...

Page 7: ...an shaft THE RISK OF FALL Never transport other persons on the machine during the work or transportation THE RISK OF FALL NEVER TRANSPORT OTHER PERSONS ON THE MACHINE DURING THE WORK OR TRANSPORTATION...

Page 8: ...al fertilizers Constructive solution is quite robust customized for intensive work and has the possibility of mechanical lateral movement Standard plant residue shredder mulcher is connected to the re...

Page 9: ...operating time of the mulcher The metal plate must always be legible visible and clean When connecting or disconnecting the mulcher to and from the tractor always move the supporter to the adequate p...

Page 10: ...y are irreparable Remove foreign objects from the field before you start working IMPORTANT By the roads footpaths public areas parks schools etc and on the rocky soil work with special care and secure...

Page 11: ...n shaft guard with the chains that are set for this purpose the cardan shaft guard must not rotate be sure to read the instructions provided with the cardan shaft If the guard is damaged immediately r...

Page 12: ...52 37 59 44 66 Tractor power HP 40 70 50 80 60 90 Tractor output shaft RPM min 1 540 540 540 Y blades kom 40 44 48 Hammer blades kom 20 22 24 Weight kg 540 575 610 Linkage kat II II II A B C D E 160 1...

Page 13: ...trying to personally move the tool to the tractor s levers Install the cardan shaft first in the tubed shaft on the tool and the other end to the output shaft of the tractor Secure the shaft with the...

Page 14: ...earest service center if necessary WORKING WITH THE PLANT RESIDUE SHREDDER MULCHER OPERATING POSITION DANGER The operator must sit in the driver s seat because only from there he can properly operate...

Page 15: ...e side panels remove the screws on one side move the roller up or down depending on the required shredding height Put the screws back and repeat the same procedure on the other side Then tighten the s...

Page 16: ...hen replacing cutting blades do the following Park the tractor with the tool on the flat area then use the hydraulics to lift the tool from the ground Place two strong supporters at both ends of the t...

Page 17: ...it with plastic foil If you have carefully performed all the activities then the tool is mobile and ready when there is the need to use it again MAINTENANCE REGULAR MAINTENANCE Remember that lower mai...

Page 18: ...ine when tightening of belts Loosen the screws on the reductor board lift or lower the reductor so that the transmission shaft is parallel to the top plate of the tool then tighten the screws Make sur...

Page 19: ...E LB1 2 CASTROL CASTROL EPX SERVICE ADJUSTMENTS AFTER THE FIRST 8 h OF WORK Check each tool after the first 8 hours of work The check procedure is as follows Detailed check of the basic condition of t...

Page 20: ...y Drain oil from the reductor and fill it with the clean oil to the appropriate level Dispose the waste oil and observe the Law on the Environmental Protection All excess oil must be removed carefully...

Page 21: ...production 2016 is in compliance with all the relevant requirements defined by European Directive 2006 42 EC for machines The product complies with the following standards SRPS EN ISO 12100 2014 SRPS...

Page 22: ...pplicable dimension or standard Pay attention to additional markings on the pages To avoid misunderstandings and errors in delivery when ordering spare parts please state the following Code and number...

Page 23: ...Page 23 FIGURE 1...

Page 24: ...Page 24 FIGURE 1...

Page 25: ...Page 25 FIGURE 2...

Page 26: ...Page 26 FIGURE 2...

Page 27: ...Page 27 FIGURE 3...

Page 28: ...Page 28 FIGURE 3...

Page 29: ...Page 29 FIGURE 4...

Page 30: ...Page 30 FIGURE 4...

Page 31: ...Page 31 FIGURE 5...

Page 32: ...Page 32 FIGURE 5...

Page 33: ...PLICABLE REGULATIONS ON SAFETY AND HEALTH PROTECTION AND REGULATIONS ON ROAD TRAFFIC FOR YOUR OWN SAFETY USE ONLY ORIGINAL PARTS MANUFACTURED BY FPM AGROMEHANIKA AD BOLJEVAC MANUFACTURER IS NOT RESPON...

Page 34: ...Page 34...

Page 35: ...Page 35...

Page 36: ...epartment 381 0 30 463 455 463 356 Service Department 381 0 30 463 619 Export import department 381 0 30 463 531 FAX 381 0 30 463 405 FOR YOUR OWN SAFETY AND TO GET ALL THE BEST FROM YOUR PLANT RESIDU...

Reviews: