Plumbing Connection To The Analyzer
Connect the supplied 1/4” id x 3/8” od x 3’ length, clear flexible PVC sample line to the flow control
valve and secure. Cut if necessary to keep the sample line as short as possible. Route the tubing
down to the analyzer, through the sample line guide hole and into the flow cell. Insert the end of the
tube about half way down from the top edge of the center drain cup in the flow cell.
Connect the two supplied 5/8” id x 3/4” od x 3’ length, clear flexible PVC drain lines to the overflow
drain on the right side of the flow cell block and to the measuring cell drain on the left side. Route the
hoses down to maintain gravity feed into a drain.
Buffer feed tubing is connected at the factory to the buffer input fitting located on the inner side of the
lower block of the flow cell and to the blue bottle cap. Route the clear 1/8” od tubing to the vinegar
bottle with the original bottle cap removed. Insert the tube with sinker attached to the bottom of the
vinegar bottle and secure the cap.
Typical Plumbing
Installation (Plumbing)
Sample Drain
Overflow Drain
Figure 8
Figure 9
Typical Plumbing
11