4.
After assembly, simply hold the stand with hand to stand the monitor upright.
Note: During standing of the whole monitor, do not press the liquid crystal screen
with hand to avoid damage to the screen.
CABLE MANAGEMENT
1.
After the installation is complete, the monitor needs to be connected with the cables.
As shown below, push up in the direction of the arrow, and then take out the bracket
back cover.
2.
Put the cables into the slot of the bracket.
Summary of Contents for PGN340
Page 1: ...PGN340 USER S GUIDE Curved Monitor UWQHD 34 ...
Page 8: ...PACKAGE CONTENT 100 240 50 60Hz 2 0A 1 8m x1 ...
Page 24: ...TROUBLESHOOTING 48 165Hz ...
Page 25: ......