66 EcoLab
–
Getting Started
To change units:
1. Click
File
on the menu bar, then click
Unit settings
2. Select the desired units
3. Click
OK
Import data
Any file that is in comma separated values text format (CSV) can be
imported into EcoLab
To import a CSV file:
1. Click
File
on the menu bar, then click
Import CSV file
2. In the dialog that opens, next to
Look in
, navigate to the
drive and folder that contains the CSV file
3. Select the file
4. Click
Open
Summary of Contents for EcoLab 3.0
Page 1: ...User Guide EcoLog XL EcoLab 3 0 Integrating student computing science...
Page 2: ...EcoLog XL User guide Third Edition First Print Printed in April 2005...
Page 3: ......
Page 13: ......
Page 111: ...110 EcoLab The Timing Wizard Between gates Result 1 3 t t t t1 t2 t3 t4 Input 1 Input 2...
Page 112: ...EcoLab The Timing Wizard 111 Pendulum one gate Result 1 5 t t t t5 t3 t1 t2 t4...
Page 133: ...132 EcoLab Workbook 4 Select an option Graph Meter or Timing...
Page 151: ...150 Troubleshooting Guide Reset Button...
Page 165: ...164 Index X X axis values 79 Y Y axis 73 74 Z Zoom 76...