- 32 -
- 33 -
6.4 Installation Tools:
6.5 Installation Procedure:
In order to secure the safe use of the range hood
and maximize its ability to ventilate cooking fumes,
the installation height is suggested as follows: The
distance from the countertop of the gas stove to
the top board of the range hood shall not be less
than 29 9/16"(750mm) and shall not be more than
32 1/2"(825mm). Where there are relevant laws
stipulating the mounting height of range hood in the
state or region, the laws shall prevail(Included but
not limited to architecture and firefighting regulations
and standards). However, the effect of cooking fumes
ventilation might be affected.
The range hood can be installed in three ways, either
with or without the upper cabinet.
Caution:
1.One of the wood screws(#10×2
9/16"(ST4.8×65mm)) for duct bracket must be
fastened to the wooden beam.
2.If it is necessary to drill the duct outlet at the back
wall, the distance from the top plane of the range
hood to the center of the hole should be at least 8"
(203mm).
Warning:
Excessively low installation height can
cause overheating of the glass panel, increasing the
possibility of breaking.
Installation of the Fotile Range Hood with
an Upper Cabinet:
Diameter of smoke
tube
Φ
6" (152.5mm)
Diameter of hole digging
Φ
6 1/2" (165mm)
16"
(405mm)
Warning:
Do wear qualified protective gloves.
1. Unpack the appliance and check the List of
Accessories.
2. Locate the wooden beam and mark the location
with a pencil.
6.3 List of Accessories:
Packing List
Standard Configuration
Product
1
Duct Cover
1
Gasket
1
Grease Cup
1
Product Manual
1
Installation Paper Template
1
Warranty Card
1
Duct Bracket
1
Hook Screw
#8×1 7/16"(ST4.2×36mm)
4
Expansion Tubes for Tiles
φ1/4"×1 5/16"(φ5.3×32mm)
4
Expansion Tubes for Plasterboards
φ3/16"×1 5/8"(φ4×40mm)
4
Duct Cover Screws
#8×3/4"(M4×18mm)
4
Upper Plate Fastening Screws
#10×2 13/16"(M5×70mm)
4
(
One of them is for
standby)
Set Screw Gasket for Upper Cabinet
Boards
φ1 5/16"(φ32mm)
4
(One for standby)
Wood Screws
#10×2 9/16"(ST5×65mm)
4
Fixing screws of the smoke baffle
plate #8×3/8"(M4×8mm)
2
(
keep another
screw for backup)
Collision Avoidance Elements
2
Housing Assembly Accessories (optional)
Blower Housing
1
Decorative Cover
1
Decorative Cover Bracket
1
Safety Buffer Baffle
1
Duct Cover Screws
#8×7/16"(M4×10mm)
4
Hook Screw
#8×1 7/16"(ST4.2×36mm)
3
Expansion Tubes for Tiles
φ1/4"×1 5/16"(φ5.3×32mm)
3
Expansion Tubes for Plasterboards
φ3/16"×1 5/8"(φ4×40mm)
3
Screws #4×3/4"(ST2.9×19mm)
2
Decorative Plate Assembly Accessories (with upper
cabinet)
6"(152.4mm)or4"(101.6mm)
Decorative Plate
1
Fixed Decorative Plate Screws
#6×1 7/16"(ST3.5×35mm)
4
Summary of Contents for JQG7522
Page 13: ...JQG7522...
Page 15: ...2 3 125V 1 2 3 4 1 2 3 4 1 2 104 40...
Page 17: ...6 7 LED 1 2 132V 104V 3 4 5 6 A 1 2 3 4 5 6 2 3 LED 1 2 3 LED LED LED...
Page 22: ...16 17 8 9 10 8 3 8 M4 8mm 11 1 2 1 2 3 4 3 LED...
Page 23: ...43 JQG7522...
Page 36: ......
Page 37: ...110100052039D...