- 38 -
- 39 -
safety stop
mounting hole
Max 29 15/16"
(760mm)
Max 30 7/8"(783mm) Min 27 7/8"(708mm)
2 5/16"(58.5mm)
4 9/16"
(115.5m)
4 9/16"
(115.5m)
Hole A
Area C Hole B
Hole A
Area C
Hole B
Caution:
one of the wood screws(#10×2
9/16"(ST5×65mm)) for main engine must be
fastened to the beam.Screws must be fixed
at hole A and B in the drawing; also wood
screws(#10×2 9/16"(ST5×65mm)) must be fixed
at bracket bores with corresponding wooden
stakes in area C.
Firstly determine the installation central point of
the range hood according to the central point
of the cooker, determine the bracket installation
location based on cooker table and mark the
place for drilling. The cooker table is about 27
7/8" (708 mm) to 30 7/8" (783 mm) away from
the central point of bracket;
The location to install the safety buffer baffle
should be 4 9/16" (115.5 mm) to the left of the
duct bracket and 2 5/16" (58.5 mm) straight up.
The location to install the decorative cover
bracket should generally be 29 15/16 " (760
mm) above the central point of the duct bracket.
If the distance between the ceiling and duct
bracket equals to or is less than the value,
secure the decorative cover bracket on the wall
right under the ceiling. If the distance is more
than the value, taller decorative covers (27
9/16" (700 mm) and 35 7/16" (900 mm) in height
respectively) need to be bought separately.
Embed the expansion tube in the punch marks:
1) Punch marks are on tiles (marble): Punch
holes (φ3/8"(φ8mm)) with an electric drill at
the marks, and embed expansion tube for
tiles(φ1/4"×1 5/16"(φ5.3×32mm)).
2) Punch marks are on plasterboards: Screw
the expansion tube for plasterboards(φ3/16"×1
5/8"(φ4×40mm)) into walls with screwdrivers at
the marks.
4. Secure the duct bracket and decorative cover
bracket to the wall with corresponding screws
and tighten the screws. Make sure the bracket
is leveled.
Caution:
One of the wood screws(#10×2
9/16"(ST5×65mm)) for duct bracket must be
fastened to the wooden beam.
5. Place the seal (notch downward) at the
air outlet of the machine and fix the outlet
housing with 4 outlet-housing bolts of
#8×3/4"(M4×18mm). Fix four outer cover bolts
of #8×7/16" (M4×10mm) at the corresponding
positions (The cover screws is provided in
the accessory bag in the packing box of the
decorative cover assembly.).
②
Take out one screw(#8×3/8"(M4×8mm)) in
the accessory bag (keep another screw for
backup);
③
Open the Smoke Baffle Plate to the
maximum angle;
④
Fix the left bracket with the screwdriver and
screw;
⑤
Install Collision Avoidance Elements on both
left and right corners of the Smoke Baffle Plate.
11. Make sure the hood is leveled. Install the
Grease Cup, and plug in the appliance for a test
run.
Warning:
Please wear the qualified protective
gloves in operation.
Caution:
Please run the machine and test if
the smoke pipe leaks air after it is sealed with
aluminum foil tape. The smoke pipe should be
able to be straightened as much as possible.
Installation Instructions for the Decorative
Cover Without Upper Cabinet
Diameter of smoke
tube
Φ
6" (152.5mm)
Diameter of hole digging
Φ
6 1/2" (165mm)
Max 29"
(735mm)
Min 15"
(380mm)
Max 30 7/8"
(783mm)
Min 27 7/8"
(708mm)
1. Unpack the appliance and check the List of
Accessories.
2. Locate the wooden beam and mark the
location with a pencil.
Framing Stud
3. Locate the duct bracket, safety buffer baffle
and decorative cover bracket:
Summary of Contents for JQG7522
Page 13: ...JQG7522...
Page 15: ...2 3 125V 1 2 3 4 1 2 3 4 1 2 104 40...
Page 17: ...6 7 LED 1 2 132V 104V 3 4 5 6 A 1 2 3 4 5 6 2 3 LED 1 2 3 LED LED LED...
Page 22: ...16 17 8 9 10 8 3 8 M4 8mm 11 1 2 1 2 3 4 3 LED...
Page 23: ...43 JQG7522...
Page 36: ......
Page 37: ...110100052039D...