20
BATTERY TEST
BATTERY
When the UPS is not on test mode,
Deep Test
will appear on the screen.
•
Deep Test:
After clicking on
Deep test,
a confirmation window will come up, as shown above.
Tap on
Yes
to start the battery self-test. Tap on
No
to cancel this operation or select if you prefer to return to the
BAT TEST menu page.
•
BAT test:
Enables the programming of the battery test in minutes. When selected, a numeric keypad will come up.
Enter the time for the duration of the test. Click on
Enter
to initiate the testing process.
To return to the BAT TEST menu page, simply click on the arrow on the bottom center of the screen.
Battery parameter:
•
Battery AH:
It is the battery capacity value.
9Ah
is the default setting.
•
Cancel BAT test:
When the unit is on battery test mode, and cancel is selected, a pop-up window will be displayed
to confirm your choice, as shown above. Click on
YES
to cancel or select the arrow on the bottom of the screen
to return to the BAT TEST menu page.
Battery setting page
Summary of Contents for FDC-1002T
Page 32: ......