HOME GLASS BALUSTER INSTALLATION
Step 4:
Mount Posts
1. Mark mounting hole locations and pre-drill a 3/8” [9.5mm]
hole.
2. Insert 3/8” x 3-1/2” [9.5mm x 89mm] Hex Head galvanized
bolts through 3/8” [9.5mm] galvanized washer and post
base plate.
Note:
•
Post Base Plate holes MUST be positioned a minimum ½”
[12.5mm] from edge of deck board.
•
Use only 3/8” [9.5mm] Hex Head Galvanized Bolts. Lag
Screws should NOT be used. Secure each post with four bolts.
Fig. 1
Step 3:
Max Post Spacing
•
6’ panel maximum post spacing is 69-1/4” [1759mm].
Note:
• Do not exceed the maximum post spacing.
6’ panel maximum post spacing is 69-1/4”
[1759mm]
Fig. 1
Fig. 2
OTP
and Proud Post: Max Post Spacing
• 8’
panel maximum post spacing is 93-7/8”.
• 6’
panel maximum post spacing is 69-7/8”.
Note: Do not exceed the maximum post spacing.
8’
Panel max post spacing 93-7/8”
6’
Panel max post spacing 69-7/8”
OTP
and Proud Post: Measuring The Panel Opening Length
• Measure the distance of the panel opening.
• Measure from the back wall of the bracket to the back wall of
the bracket on other post.
• Confirm that the measurements for the top brackets are the
same as the bottom brackets.
Measure the panel opening
Not here
Measure from
back of bracket
Check measurement with top
3/12
OTP
and Proud Post: Max Post Spacing
• 8’
panel maximum post spacing is 93-7/8”.
• 6’
panel maximum post spacing is 69-7/8”.
Note: Do not exceed the maximum post spacing.
8’
Panel max post spacing 93-7/8”
6’
Panel max post spacing 69-7/8”
OTP
and Proud Post: Measuring The Panel Opening Length
• Measure the distance of the panel opening.
• Measure from the back wall of the bracket to the back wall of
the bracket on other post.
• Confirm that the measurements for the top brackets are the
same as the bottom brackets.
Measure the panel opening
Not here
Measure from
back of bracket
Check measurement with top
3/12