
5
PARTS & TOOLS CHECK LIST
The following tools are recommended for this installation.
Caulking Gun x1
9-16 Wrench x1
Hand Level x1
Safety Glasses x1
Square Straight Edge x1
Impact Drill with Socket x1
Sharpie x1
Tape Measure x1
Roto Hammer x1
Sledge Hammer x1
Working Gloves x1
1/8” and 1/4”
Allen Key x1
Grinder With Cutting Disk
x1