![Forno Bravo Giardino60 Installation And Operating Manual Download Page 28](http://html1.mh-extra.com/html/forno-bravo/giardino60/giardino60_installation-and-operating-manual_2320451028.webp)
5. Build a grid of 1/2" rebar slightly shorter than the
external dimension of the wood forms, on 12" centers,
starting 6" in from the edges of the form, set half-way up
the 3 1/2” concrete layer (about 1 3/4”).
3.4 Rebar set in center of the concrete pad.
6. Pour 3 1/2” of standard concrete and allow for it to start
curing before adding the FB Board. Yo do not want to
install FB Board on wet concrete, as it will wick up water
3.6. Structural layer waiting on insulating layer.
7. Cut and place the FB Board insulation, making sure the
insulation and the Giardino oven face straight forward and
that the front of the oven is exactly where you want it.
3.7. FB Board set in place.
Giardino Installation and Operating Manual
© Forno Bravo, LLC 2010. All Rights Served.
Ver. 1.2
28