background image

T 1.800.451.0410  |  F 412.781.7840  |  www.forms-surfaces.com

page 7 of 7  |  10-16-17

LEVELe

®

 

ELEVATOR INTERIORS WITH LIGHTPLANE

INSTALLATION INSTRUCTIONS

© 2017 Forms+Surfaces®  |  All dimensions are nominal. Specifications and pricing subject to change without notice. For the most current version of this document, please refer to our website at www.forms-surfaces.com.

32

REAR

SIDE

Install Base Facing.

• 

Complete the installation by installing the 

   bases. 

• 

Remove backer from VHB tape on Base 

   Supports. 

• 

The Base Facing will engage with the 

   previously installed Base Cleat. Center Base 
   Facing, aligning with end point markings. 

• 

Press firmly to secure Base Facing to VHB 

   tape on Base Supports.

Base
Cleat

Base 
Facing

Base 
Support

SIDE VIEW

31

Connect Ceiling Power Box to local power.

• 

Remove the cover from the power box. 

• 

Insert the local power supply conduit into the 

   power box opening. 

• 

Secure the ground wire to the junction point. 

• 

Return the cover to the power box and secure 

   with provided screws. 

• 

Remove the backer from the factory-installed 

   VHB tape on the bottom of the power box, 
   and secure it to the cab ceiling.

Summary of Contents for levele

Page 1: ...surfaces com TOOLS NEEDED IMPACT DRILL SQUARE MASKING TAPE PENCIL LEVEL TAPE MEASURE CRESCENT WRENCH 3 8 DRILL BIT CENTER PUNCH BRUSH SUCTION CUP S DRILL BIT EXTENDER 8 18 SQUARE PHILIPS COMBO DRIVE B...

Page 2: ...efore proceeding Secure the Base Cleat with the provided self drilling screws Repeat for the remaining side walls Note The standard base height is 3 5 Custom sized spacers will be provided for custom...

Page 3: ...and level and engage fully with the mounting extrusion 9 Attach side Panel Clips Attach the clips as shown using the provided self drilling screws One panel clip should be installed every 18 24 for p...

Page 4: ...et screws with provided allen key 16 17 18 REAR SIDE REAR SIDE Install top Panel Clips Attach the clips as shown using the provided self drilling screws One panel clip should be installed every 18 24...

Page 5: ...as indicated in previous steps Install 2 Cover Extrusions on each wall Cover the screws and Mounting Extrusion with the Cover Extrusion provided The Cover Extrusion is backed with factory supplied foa...

Page 6: ...ds to the power box leads Adjust the LightPlane Panel potentiometer to desired brightness prior to installing the ceiling Secure excess lead to ceiling to keep it out of view Attach U bolts to elevato...

Page 7: ...acker from VHB tape on Base Supports The Base Facing will engage with the previously installed Base Cleat Center Base Facing aligning with end point markings Press firmly to secure Base Facing to VHB...

Reviews: