background image

T 1.800.451.0410  |  F 412.781.7840  |  www.forms-surfaces.com

page 1 of 7  |  10-16-17

LEVELe

®

 

ELEVATOR INTERIORS WITH LIGHTPLANE

INSTALLATION INSTRUCTIONS

© 2017 Forms+Surfaces®  |  All dimensions are nominal. Specifications and pricing subject to change without notice. For the most current version of this document, please refer to our website at www.forms-surfaces.com.

TOOLS NEEDED

IMPACT

DRILL

SQUARE

MASKING TAPE

PENCIL

LEVEL

TAPE

 MEASURE

CRESCENT WRENCH

3/8" DRILL 

BIT

CENTER 

PUNCH

BRUSH

SUCTION

 CUP(S)

DRILL BIT

EXTENDER

#8-18 SQUARE / PHILIPS 

COMBO DRIVE BIT

U-BOLT

LOCKING DISC

3/8" - 16 

FLANGE NUT

INCLUDED

CEILING COMPONENTS

STANDARD LEVELe COMPONENTS

LIGHTPLANE COMPONENTS

LIGHTPLANE PANEL

POWER BOX 

ALLEN

KEY

MOUNTING 

EXTRUSION

PANEL

CLIP

CORNER 

REVEAL

FRONT

REVEAL

COVER 

 EXTRUSION

BASE CLEAT

BASE 

SUPPORT

BASE 

FACING

SPACER

CEILING POWER BOX

#8 x 1/2"

SELF TAPPING SCREW

W/ #2 SQUARED

 DRIVE HEAD

Summary of Contents for levele

Page 1: ...surfaces com TOOLS NEEDED IMPACT DRILL SQUARE MASKING TAPE PENCIL LEVEL TAPE MEASURE CRESCENT WRENCH 3 8 DRILL BIT CENTER PUNCH BRUSH SUCTION CUP S DRILL BIT EXTENDER 8 18 SQUARE PHILIPS COMBO DRIVE B...

Page 2: ...efore proceeding Secure the Base Cleat with the provided self drilling screws Repeat for the remaining side walls Note The standard base height is 3 5 Custom sized spacers will be provided for custom...

Page 3: ...and level and engage fully with the mounting extrusion 9 Attach side Panel Clips Attach the clips as shown using the provided self drilling screws One panel clip should be installed every 18 24 for p...

Page 4: ...et screws with provided allen key 16 17 18 REAR SIDE REAR SIDE Install top Panel Clips Attach the clips as shown using the provided self drilling screws One panel clip should be installed every 18 24...

Page 5: ...as indicated in previous steps Install 2 Cover Extrusions on each wall Cover the screws and Mounting Extrusion with the Cover Extrusion provided The Cover Extrusion is backed with factory supplied foa...

Page 6: ...ds to the power box leads Adjust the LightPlane Panel potentiometer to desired brightness prior to installing the ceiling Secure excess lead to ceiling to keep it out of view Attach U bolts to elevato...

Page 7: ...acker from VHB tape on Base Supports The Base Facing will engage with the previously installed Base Cleat Center Base Facing aligning with end point markings Press firmly to secure Base Facing to VHB...

Reviews: