background image

3

1.

Place conveyor on its side, and remove button head screws (4 each) from the bottom pan. Install the dryer stand 

brackets using the screws that were removed (Fig 5). 

2.

Place conveyor upright and slide dryer shafts through holes in dryer assembly. Guide shafts into one of the dryer 

stand brackets as the dryer is lowered into position, (Fig 6). Guide shafts into opposite dryer stand bracket (Fig 7).

3.

Install “E-Clips” into grooves on dryer shafts (2ea. per shaft), as shown in Fig 8.    

4.

Insert dryer power cord into the power connection on the dryer and into “dryer outlet” connection on the conveyor. 

Turn on the Dryer’s power switch. Dryer Unit is now ready to operate.  

Note:

 Power to the dryer will only be enabled (turned on) when the conveyor is running. The dryer’s power switch 

must also be turned on. 

OPTIONAL DRYER INSTALLATION

Button Head Screws

Dryer Mounting Shafts

Stand Brackets

E-clips

E-clips

Fig 5

Fig 6

Fig 7

Fig 8

E-clip

Reviews: