background image

PRE-DRILL 

WITH 2MM BIT 

FOR ALL STEPS 

BELOW.

PRE-DRILL 

WITH 2MM BIT 

FOR ALL STEPS 

BELOW.

PRE-DRILL 

WITH 2MM BIT 

FOR ALL STEPS 

BELOW.

60

MM

SCREWS

60

MM

SCREWS

60

MM

SCREWS

60

MM

SCREWS

60

MM

SCREWS

5

1a

FLOOR & PANEL LAYOUT

1c

APEX SECTIONS

1b

SIDE PANELS 

Position the floors

 in your desired location. 

Turn the floors upside down to 

secure the 

sections together

 by screwing through the 

adjoining bearers.

Layout the panels

 around your shed base.

We recommend to start in a back corner then 

work from the back panels to the front 

panels for assembly. 

Attach the first Apex Section

 to one of the 

side panels by screwing to the wall panels as 

shown below.

Attach the other Apex Section

 to the other 

side panels by screwing to the wall panels as 

shown below.

Start at a back corner.

 See the section layout 

on page 4 to confirm position. Secure the 

corner as shown below. 

Repeat the process for the remaining panels 

and 

secure

 the 

panels together.

 Make sure 

that the bottom frame of the wall panel rests 

on the outer edge of the floor.

Secure the panels into place by 

screwing into 

the floor bearers.

 Use 4 x screws for the larger 

panels and 1 x screw for the smaller panels as 

shown in the bottom visual.

EG. INSIDE CORNER

SIDE PANEL

BACK PANEL

EG. SIDE PANELS

APEX SECTION

EG. INTO FLOOR BEARERS

APEX SECTION

Summary of Contents for Timberdale Tongue & Groove

Page 1: ...Thank you for purchasing your shed from Forest Garden No matter what size garden a shed is the most practical of garden structures Simply follow these step by step instructions and our top tips and you ll be enjoying your shed for many years to come If you have any questions or need advice our friendly team is here to help Forest Garden Oak Drive Hartlebury Trading Estate Hartlebury Worcestershire...

Page 2: ...ied If you have an existing base and think it s suitable for your new shed to be sited on it is important you check that it is level and doesn t deviate by any more than 15mm from edge to edge If this isn t the case the building will twist causing gaps to appear in the sections and the roof doors and windows to misalign There s more information on base preparation on our website www forestgarden c...

Page 3: ...building well ventilated to avoid mould MAKE SURE YOU POSITION YOUR SHED IN THE BEST LOCATION IN YOUR GARDEN Avoid areas where water pools and is constantly wet Position away from trees and cut back any overhanging foliage which can cause moisture to be trapped against shed walls and debris to collect on the roof 1 RAISE YOUR SHED OFF THE GROUND Ideally any concrete base should be the same footpri...

Page 4: ...nel orientation during construction This will apply to all of the corners for your chosen shed 4 IDENTIFY YOUR SHED Use the floor plan below to identify the side panel positions before assemblying your shed Use the key and visuals below as a guide PANEL POSITION When assemblying your wall panels ensure the timber framing on the panels are flush at the corners The space left next to the board is fo...

Page 5: ...ach the first Apex Section to one of the side panels by screwing to the wall panels as shown below Attach the other Apex Section to the other side panels by screwing to the wall panels as shown below Start at a back corner See the section layout on page 4 to confirm position Secure the corner as shown below Repeat the process for the remaining panels and secure the panels together Make sure that t...

Page 6: ...pex Sections frame Ensure the Roof Panels are butt up against the other Roof Panels Support the centre of the Roof Panels using the Truss Block Secure the Truss Block to all Roof Panels with 1 x screw Fix the Roof Panels together through the adjoining framework Fix a Truss Support Block to the centre of each side of your shed Ensure they are 1645mm from the floor These will support your roof panel...

Page 7: ...low Attach the Cranked Hinges to the Window Use the measurement provided as a positioning guide Secure the Window to the Window Panel framework Ensure the pin on the hinges hook onto the T G board on the front of the Window Panel and the window can open easily before securing into place Secure the Casement Stay Pins to the Window and interior sill Secure the Casement Stay with its supplied screws ...

Page 8: ...th 5 8mm drill bits and drill 3 x holes to provide the hole for the key Secure the Rim Lock to the Lock Block with its supplied fixings Ensure to hook the Rim Lock over the edge of the Lock Block Thread the spindle through to attach the Handle INSIDE LOCK BLOCK TOP TIP Mark out with pencil use the rim lock as a guide to drill the holes in the correct positions DOOR FIXINGS INSIDE INSIDE INSIDE OUT...

Page 9: ... TPMODGAB1826 Apex Section 417x1826mm 2 H 45121820PPT Cover Strip 45x12x1820mm 10 I 45120140PPT Joiner Cover Strip 45x12x140mm 4 J 33121631PPT Door Weather Strip 33x12x1631mm 2 K 45450155PAI24PT Truss Support Block 45x45x155mm 2 L TPMOD86RHRF Right Roof Panel 1075x1224mm 2 M TPMOD86LHRF Left Roof Panel 1075x1224mm 2 N 45450085PAII24PT Truss Block 45x45x85mm 1 O 45280150PPT Apex Block 45x28x150mm 8...

Reviews: