background image

12   

│   

Installing the Forest Shuttle

®

 S / M / L  

Z-Wave

 

 

 
Forest Shuttle is not suitable for humid spaces, like bathrooms or outdoors. 
It is important for the safety of persons to follow these instructions. Save these instructions. 
Do not use the product for any other purpose than intended. In order for the Forest Shuttle S / M / L to function 
correct and safe, the complete curtain system must be assembled with original parts and devices of Forest Group 

Nederland B.V. This includes all components of the curtain track and power supply adaptor. 

 

Forest Group does not assume liability for resulting damages to property or personal injury, defects, labour on location, service 
calls, reinstallation or expenses involved shipping, packing or returning goods, if the product has been abused/modified in any 
way or damaged by improper use or failure to observe these operating instructions. The warranty/guarantee will then expire! 
 
Do not allow children to play with the system or controls. Keep remote controls away from children. 
Frequently examine the installation for imbalance and signs of wear or damage. Do not use if repair or adjustment is necessary. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

v1_3 

Summary of Contents for SHUTTLE L Z-Wave

Page 1: ...Installing the FOREST SHUTTLE S M L Z Wave ...

Page 2: ... after the end positions have been set position the master carrier s into half open position Attach the motor to the track make sure to secure the locking pin into the motor pulley Shuttle L Z Wave Shuttle S M Z Wave USA Connect the AC plug 100 240V Connect the 24V plug into the socket of to the power socket of Shuttle L the Shuttle S and connect the AC plug to the wall socket loop the cord throug...

Page 3: ...ravel automatically towards the closed position SETTING OPEN LIMIT When the closed position is reached that end limit is set Pull the master carrier s to the open position The master carrier s will travel automatically towards the open position Stack back When the master carrier reaches the fully open position it will stop yellow LED4 is on Now the open limit setting can be adjusted by hand by rem...

Page 4: ...ced Z Wave learning out Product Reset Please use this procedure only when your network primary controller is missing or otherwise inoperable Press the configuration button 25 times and confirm by pressing the button once more for 4 seconds until the led blinks 3 times and goes OFF This way of excluding is less preferred Please use this procedure only when the network primary controller is missing ...

Page 5: ... 13x 14x or 15x button and confirm by pressing button once more for 4 seconds until the led blinks 3 times and goes OFF The IR receiver can only be connected to port 1 Place the eye of the receiver cord in view of the IR remote If necessary change the IR channel as shown on page 4 Factory default To reset all settings press button 16x To confirm press button once more for 4 seconds until the led b...

Page 6: ...is connected to pin 3 COMMON the Shuttle will open the curtain CLOSE when pin 8 is connected to pin 3 COMMON the Shuttle will close the curtain STOP when pin 1 and 8 are connected to pin 3 COMMON the Shuttle will stop moving the curtain Different modes can be set Pulse when short contact is made the curtain will open or close fully default setting Continuous the curtain will move as long as the co...

Page 7: ...r communication with a controller This device can also act as a wireless repeater to forward commands for another device in the Z Wave network to expand the range of the network This function works for every Z Wave device from any manufacturer when included into the same Z Wave network Unlike a normal slave a routing slave can store a number of static routes which he uses to send a routed RF frame...

Page 8: ... is fully open 0x00 is fully closed 0x01 0x63 is a curtain rail position COMMAND_CLASS_ASSOCIATION_V2 The Association Command Class is used to associate other devices with the Shuttle LZ The Shuttle LZ only has 1 supported association group This group holds the lifeline to the controller according to Z Wave Plus standards Group 1 lifeline Maximum supported nodes per group 1 The node associated in ...

Page 9: ...multilevel start level command is received The curtain reached an end position fully open or full closed Supported Report Because of version 3 of this command class the Shuttle LZ responds with the following types Primary Switch Type 0x03 o 0xFF is Open o 0x00 is Closed Secondary Switch Type 0x00 NOT SUPPORTED NOTE 1 due to the limitations of this type of multilevel a curtain rail the Duration byt...

Page 10: ...ually the DEVICE_RESET_LOCALLY_NOTIFICATION command is sent to node associated in the lifeline association group COMMAND_CLASS_SWITCH_ALL The Shuttle LZ supports switch all functionality and therefore can be in included in a switch all broadcast If Shuttle LZ is configured to switch all mode 0x00 is excluded from all switch on off functionality 0x01 is excluded from the all on but not the all off ...

Page 11: ... IP20 IP20 IP20 Max running time in one direction 240 sec 240 sec 240 sec Sound level 40dB 40dB 40dB Ambient temperature 0 40 C 32 104 F 0 40 C 32 104 F 0 40 C 32 104 F Relative humidity 10 80 10 80 10 80 Maximum useable altitude above sea level 2000m 6561ft 2000m 6561ft 2000m 6561ft Certification Marking CE CE CE TECHNICAL SPECIFICATION POWER SUPPLY Shuttle S Shuttle M Receiver Model ZDA240150 ZF...

Page 12: ... all components of the curtain track and power supply adaptor Forest Group does not assume liability for resulting damages to property or personal injury defects labour on location service calls reinstallation or expenses involved shipping packing or returning goods if the product has been abused modified in any way or damaged by improper use or failure to observe these operating instructions The ...

Reviews: