background image

Overlap Apex Shed

4' x 3'' 

Important : 

Assembly of this 

shed requires a 

minimum of two 

adults.

Issue 0215

B

ODA4PE

PLAIN END 

8987658

ROOF SHEET

QTY 2

 

E

 

A

ODA43 PARTS LIST

11658668

FLOOR SHEET

QTY 1

SDRDT

DOOR 

ODA4DE

DOOR END 

20121695PDT

20 x 1695mm STRIP QTY 1

H

 K

H

45280866

866mm BATTEN QTY 1

F

Place the corner strips so that they cover the joins 
between the panels. Fix each in place using 3 x 30mm 
screws

A

2

4

1

1

C

ODA3PS

PLAIN SIDE 

QTY 2

J

3

REQUIRED TOOLS : 
(NOT SUPPLIED)

POZI DRIVE SCREWDRIVER

SPIRIT LEVEL

TAPE MEASURE

HAMMER

51120810PAII58DT

810mm BARGE BOARD QTY 4

 I

A

Must Pre drill for 
each screw used.

28280898

898mm BATTEN QTY 2

 J

FELT 

85062 Qty 1

C

Place the panels on top of the floor. Make sure that all of the panels are tight and flush before 
fixing them to each other using 3x50mm screws.

Make sure that the panels are sitting flush before fixing to the floor. Use 2 x 50mm screws for 
each panel. Make sure that all of the screws are positioned so that they screw  in to the bearers 
underneath.

Fixing Pack (OPA43FP)

This fixing pack is used for several products. 
There may be additional fixings.

Not to Scale

Flush Hinge 

Qty 2

50mm Screw Qty 22

30mm Nail Qty 36

25mm Screw Qty 17

Hasp & 

Staple

30mm Screw Qty 17

10mm Felt tacks

 Qty 60

G

FIN20010512DTR

FINIAL
 QTY 1

L

A

Fix the 20 x 1695mm strip 
to the side of the door 
frame so that it is tight with 
the cladding and flush with 
the frame. Use 3 x 30mm 
screws.

L

SHARP KNIFE

D

A

B

a

E

40mm Screw Qty 12

 

 

 

44161570DT

1570mm C/STRIP QTY 4

H

M

28280866PT

28x28x866mm GREEN BEARER QTY 4

Place the floor sheet (larger) over the top of two of the 866mm green battens. Make sure that the 
sheet is flush on all sides with the battens before fixing each in place using 4 x 30mm nails. 
Position the two remaining battens underneath so that there is a 351mm between each bearer. 

351mm

351mm

M

D

Place the hinge against the inside of the door frame and position the large section 
of the hinge so that it is flush with the inside of the framing as shown. Fix with 
25mm screws.

Open the hinge and fix the smaller section to the door framing. Again make sure 
that the hinge is flush and that the holes are positioned so that the 25mm screws 
locate correctly into the batten.

b

IMPORTANT, RETAIN FOR FUTURE REFERENCE; READ 

CAREFULLY

This building is pre-treated with a factory base coat for 
protection during storage and transit. We recommend that 
you treat your new building as soon as possible after 
assembly using a wood preservative treatment. Apply in 
accordance with the manufacturers instructions.

- This product must be built on a solid level base.
- The roof of this building is not a load bearing structure.
- Timber is a natural material. It will shrink and swell as a 
result of varying moisture content.
- Due to the nature of the material the doors may need some 
trimming for a neater fit.
- Please keep all plastic bags and small parts away from 
children

Technical Helpline:

 0333 7777 089

  8.30 am and 5.00 

pm  Monday to Friday.

Please check all parts prior to assembly

Assembly of damaged parts may be deemed to be 
acceptance and this may affect the remedies you are entitled 
to. 
If the product is not constructed in accordance with the 
instructions, or is altered in any way (e.g. painted), the 
manufacturer cannot be held liable for any resulting damage.

Reviews: