Overlap Apex Shed
4' x 3''
Important :
Assembly of this
shed requires a
minimum of two
adults.
Issue 0215
B
ODA4PE
PLAIN END
8987658
ROOF SHEET
QTY 2
E
A
ODA43 PARTS LIST
11658668
FLOOR SHEET
QTY 1
SDRDT
DOOR
ODA4DE
DOOR END
20121695PDT
20 x 1695mm STRIP QTY 1
H
K
H
45280866
866mm BATTEN QTY 1
F
Place the corner strips so that they cover the joins
between the panels. Fix each in place using 3 x 30mm
screws
A
2
4
1
1
C
ODA3PS
PLAIN SIDE
QTY 2
J
3
REQUIRED TOOLS :
(NOT SUPPLIED)
POZI DRIVE SCREWDRIVER
SPIRIT LEVEL
TAPE MEASURE
HAMMER
51120810PAII58DT
810mm BARGE BOARD QTY 4
I
A
Must Pre drill for
each screw used.
28280898
898mm BATTEN QTY 2
J
FELT
85062 Qty 1
C
Place the panels on top of the floor. Make sure that all of the panels are tight and flush before
fixing them to each other using 3x50mm screws.
Make sure that the panels are sitting flush before fixing to the floor. Use 2 x 50mm screws for
each panel. Make sure that all of the screws are positioned so that they screw in to the bearers
underneath.
Fixing Pack (OPA43FP)
This fixing pack is used for several products.
There may be additional fixings.
Not to Scale
Flush Hinge
Qty 2
50mm Screw Qty 22
30mm Nail Qty 36
25mm Screw Qty 17
Hasp &
Staple
30mm Screw Qty 17
10mm Felt tacks
Qty 60
G
FIN20010512DTR
FINIAL
QTY 1
L
A
Fix the 20 x 1695mm strip
to the side of the door
frame so that it is tight with
the cladding and flush with
the frame. Use 3 x 30mm
screws.
L
SHARP KNIFE
D
A
B
a
E
40mm Screw Qty 12
44161570DT
1570mm C/STRIP QTY 4
H
M
28280866PT
28x28x866mm GREEN BEARER QTY 4
Place the floor sheet (larger) over the top of two of the 866mm green battens. Make sure that the
sheet is flush on all sides with the battens before fixing each in place using 4 x 30mm nails.
Position the two remaining battens underneath so that there is a 351mm between each bearer.
351mm
351mm
M
D
Place the hinge against the inside of the door frame and position the large section
of the hinge so that it is flush with the inside of the framing as shown. Fix with
25mm screws.
Open the hinge and fix the smaller section to the door framing. Again make sure
that the hinge is flush and that the holes are positioned so that the 25mm screws
locate correctly into the batten.
b
IMPORTANT, RETAIN FOR FUTURE REFERENCE; READ
CAREFULLY
This building is pre-treated with a factory base coat for
protection during storage and transit. We recommend that
you treat your new building as soon as possible after
assembly using a wood preservative treatment. Apply in
accordance with the manufacturers instructions.
- This product must be built on a solid level base.
- The roof of this building is not a load bearing structure.
- Timber is a natural material. It will shrink and swell as a
result of varying moisture content.
- Due to the nature of the material the doors may need some
trimming for a neater fit.
- Please keep all plastic bags and small parts away from
children
Technical Helpline:
0333 7777 089
8.30 am and 5.00
pm Monday to Friday.
Please check all parts prior to assembly
Assembly of damaged parts may be deemed to be
acceptance and this may affect the remedies you are entitled
to.
If the product is not constructed in accordance with the
instructions, or is altered in any way (e.g. painted), the
manufacturer cannot be held liable for any resulting damage.