6
Forest Garden Ltd, Unit 288 Hartlebury Trading Estate, Hartlebury, Worcestershire, DY10 4JB
Biocidal Product Regulation (EU 528/2012) Article 58 Information
This article contains timber treated with Celcure AC-500, incorporating biocidal products to give protection against wood destroying insects & wood rotting fungi
.
Contains:
Basic copper carbonate (Copper (II) carbonate – Copper (II) hydroxide (1:1)), Boric acid, Benzalkonium chloride.
Wear gloves when handling freshly treated wood. Avoid breathing dust when cutting treated or untreated wood. Dispose of off-cuts responsibly – do not burn.
7
Lift the roof sections into place making sure that they are in line with the apex and
the door and plain ends.
Fix the roof in place using 30mm nails spaced at approximately 300mm intervals.
(Make sure the nails locate into the framework of the panels)
Place the barge boards against the front and back of the
shed. Make sure that these are in line with the roof sheet
and meet at the apex. Fix each in place using 3 x 40mm
screws.
Place the finial over the top of where the barge boards
meet and fix it in place using 2 x 30mm screws.
Unroll the felt and cut it into two equal lengths. Place the sheets
on each side so that there is a 50mm overhang on the eaves
and they overlap at the apex. Fix these to the roof using felt
nails spaced at 150mm intervals. Cut and fold the corners
securing with a single felt nail for each.
8
5
I
9
Before fixing the Hasp to the door make sure that it is in line with the framing
on the reverse of the door and that it closes over the Staple. Fix this in place
using 3 x 25mm screws.
Position the Staple opposite, again making sure that it is in line with the
framing behind and fix it in place using 2 x 25mm screws.
Place the roof board on to one of the 898mm battens. Make sure that the
board is flush on all sides.
Fix each batten in place using 30mm nails spaced in 300mm intervals.
(Repeat for the other roof section)
J
F
G
Attention
Take care when
cutting and
trimming the roof
felt.
Maintenance.
We recommend that you treat your shed at the beginning of each season with wood preservative treatment. Apply in
accordance with the manufacturers instructions.
Regularly check (1) All fixings are secure (2) Roofing felt is free of holes and tears (3) Sand off any rough/sharp edges.
H
Place the 866mm batten so that it connects the door end and plain end.
Fix this in position using a 50mm screw for each end as shown.
4
K