FRAME ASSEMBLY

9

5

Connect (4) PURPLE poles to the BLUE uprights to 

complete the vertical assembly. Next, attach the (4) 

remaining 3-way connectors to the open ends of the 

PURPLE poles.

Summary of Contents for SIM IN A BOX BIRDIE SIAB ENCLOSURE

Page 1: ......

Page 2: ...TABLE OF CONTENTS SPECIFICATIONS 1 SAFETY INSTRUCTIONS 2 WHAT S INCLUDED 3 OVERVIEW OF ENCLOSURE 4 FRAME ASSEMBLY 5 11 ENCLOSURE ASSEMBLY 12 17 ...

Page 3: ...REQUIREMENTS BIRDIE SIAB ENCLOSURE 8 4 H x 10 10 W x 17 D A STEP STOOL OR LADDER WILL BE NEEDED DURING ASSEMBLY IT IS RECOMMENDED THAT AN ADDITIONAL PERSON ASSIST IN THE ASSEMBLY OF THIS ENCLOSURE 117 LBS BLACK SURROUND FRAME WHITE IMPACT SCREEN 7 7 H x 10 1 W x 12 7 DIAG MINIMUM OF 12 WIDTH 18 LENGTH AND 9 CEILING HEIGHT 1 ...

Page 4: ...ecially when others are swinging golf clubs or hitting balls into the screen Make sure the setup is far from gas lines electric heaters fireplaces candles or any other source of heat or fire hazard When not in use store neatly in a cool dry location and pro tected from weather elements and direct sunlight Foresight Sports is not responsible for any damage to proper ty and or any personal injury Be...

Page 5: ...DED 3 18 COLOR CODED SNAP BUTTON POLES 1 PREMIUM IMPACT SCREEN 1 BLACK NYLON SURROUND 4 FOAM PADDING STRIPS 2 L SHAPED CONNECTORS 6 3 WAY CONNECTORS 2 SIDE BARRIER NETS 2 SAND BAGS 80 BALL BUNGEES BIRDIE ENCLOSURE ...

Page 6: ...tand golf ball strikes up to 250 MPH In independent head to head testing conducted by the team at MyGolfSpy with its mission to inform and protect the golf con sumer with unbiased data driven methods this Premium Golf Simulator Impact Screen outperformed what has been the industry s most popular impact screen on the market The results proved the durability of this new Premium screen is superior to...

Page 7: ...tors Organize by color 4 PURPLE poles with a single stripe on one end and double stripes on the opposite end 4 BLUE poles with single stripes on both ends 1A 3 YELLOW poles with single stripes on one end and double stripes on the opposite end ...

Page 8: ... you will connect the GREEN single stripe end to the connector piec es You will connect the YELLOW single stripe ends to the ORANGE double stripe ends 4 GREEN poles with single stripes on both ends 3 ORANGE poles with single stripes on both ends 1B ...

Page 9: ...MEMBER Connect the double striped end of the YEL LOW pole to the single striped end of the ORANGE pole And the 3 way connectors will attach to the single striped end of each pole 3 Assemble the entire lower section by attaching 2 GREEN poles to the 3 way connectors and then at tach the 2 L shaped connectors to the ends of the 2 GREEN poles ...

Page 10: ...act as bottom uprights for the structure TIP At this point in the assembly make sure button snaps are fully engaged in each fitting Also this would be a good time to place the structure near its final location due to the added weight of the screen and surround in future steps ...

Page 11: ...FRAME ASSEMBLY 9 5 Connect 4 PURPLE poles to the BLUE uprights to complete the vertical assembly Next attach the 4 remaining 3 way connectors to the open ends of the PURPLE poles ...

Page 12: ...k section and attach 1 ORANGE pole to the back right 3 way connector After attach 1 YELLOW pole to the ORANGE pole and then attach that YELLOW pole to the back left 3 way connector Repeat these same steps for the front facing upper section ...

Page 13: ...FRAME ASSEMBLY 11 7 To complete the frame structure attach the 2 re maining GREEN poles to the open 3 way connectors at the top ...

Page 14: ...der and it is recommended to have an additional person to assist with the following steps Unfold the black surround and position it to the outside of the frame 1 Make sure that the velcro strips of the surround will be facing the inside of the frame 2 Make sure the grommet holes of the surround are positioned along the back of the frame ...

Page 15: ...ith the assistance of another per son and bring the surround across the structure so that it crosses atop the opposite GREEN pole and then down the opposite side of the frame Once the black surround is in place remove the velcro cov er strips to begin wrapping the surround panels around the poles ...

Page 16: ...piece under the bottom pole and then folding it up to secure it with the velcro strip Once the velcro is in place connect the black surround with the bungee balls Re member to position the balls to the inside of the enclosure Con tinue connecting the surround with bungee balls and then move on to impact screen ...

Page 17: ...creen to the four corners The bungee cord should be thread ed through the grommet holes in the screen then wrapped around the pole Make sure the bungee ball is positioned outside of the enclosure Repeat the bungee ball attachment through every grommet hole of the impact screen Move to the back of the screen and enclosure to attach the back flaps along the uprights These flaps will conceal the bung...

Page 18: ...velcro along the top and bottom of the screen and 2 shorter pads that will attach to the two sides of the screen Match the angle pieces of the foam similar to a picture frame to complete the finished look of the screen Press along the top bottom and down the sides to make sure the foam is complete ly attached to the enclosure ...

Page 19: ...re Simply attach the velcro side of the net along the front poles and black surround velcro strip Start at the bottom with the velcro and run it up the pole as high as possible Once attached the net can be extend outward and connect to the provided sandbag Fill the sandbag with the appropriate amount of sand that will then keep the side barrier netting extended and taut ...

Page 20: ......