Step 14
Important:
Study and follow the diagram carefully.
A
Feed the bolt end of the 3100mm Upper cable (
48#
) up through opening in Upper frame . Place 1PC
Pulley (
42#
) below the cable and secure the 1
st
pulley using 1PCM10 × 65 Allen bolt (64) ,2PC
Bushing (
43#
)and 1XM10 Aircraft nut (
77#
).
B
Draw the cable backwards and place the 2
st
pulley below the cable , Secure the pulley with the same
way in A.
C
Draw the cable around the pulley and front , Place the 3
st
pulley below the cable and secure them
with 1PC M10
×
45Allen bolt (67), 2pcs
φ
10 washers(73#),and 1 pc M10 Aircraft nut(77#).
D
Draw the cable around the pulley and backwards,Place the 4
st
pulley below the cable and secure it
with the same way in C.
E
Draw the cable around the pulley and downwards,Place the 5
st
pulley onto the cable, Secure the
pulley with double floating pulley bracket(30#) together with the 1pc M10*50 Allen Bolt(83#),2pcs
φ
10
washers(73#),2 pcs bushing(82#), 2 pcs retainer(61#),and 1 pc M10 Aircraft nut(77#).
F
Draw the cable around the pulley and upwards ,Place the2X 6
st
pulley below the cable and secure
them with the same way in A.
G
Draw the cable around the pulley and downwards,thread the end of the upper cable to the top
opening of the selector rod at least 5 laps to keep safe.
21
Summary of Contents for JX-DS913
Page 19: ...Assembly Instructions 18 ...
Page 21: ...Assembly Instructions 20 ...
Page 23: ...Assembly Instructions 22 ...
Page 34: ......