![Forbes Marshall CODEL EnergyTech 300 Series Installation, Commissioning & Operating Manual Download Page 26](http://html1.mh-extra.com/html/forbes-marshall/codel-energytech-300-series/codel-energytech-300-series_installation-commissioning-and-operating-manual_2316943026.webp)
Section 6
Commissioning
Page: 26
CODEL
A Forbes Marshall Company
Issue: A | Revision: 9 | Date: 15/10/21 | Reference: 100246
6
Commissioning
Power-Up
:
•
Turn on the power to the device.
•
Wait for power-up sequence to complete and Data validity:
The welcome screen displays Codel-
FM (manufacturer’s name) and
the
EnergyTech series model.
The system will now enter initialising, this process will last 30 seconds.
Few seconds later the measurement screen appears.
•
Wait for data valid LED (green) to come on.
In order to commission the Energy Tech 301, it is necessary to work closely with mains voltages. Only trained
and competent persons should commission this unit using insulated tools and wearing the appropriate safety
equipment. The technician should acquaint himself with site safety instructions and proceed with due caution.
WARNING!
Ensure that the dust collector is in good working order with no leaking filter bags and the process is not subject
to upset conditions. It is essential to the future accurate operation of the EnergyTech 301 that the dust collection
system is operating at its normal efficiency. Failure to do so may result in poor results when the system is returned
to normal
WARNING!
Summary of Contents for CODEL EnergyTech 300 Series
Page 71: ...300...