40
Instructions for the installer
3. Instructions for the installer
3.1 Installation standards
This boiler must be installed in compliance with the laws and standards in force in the country of installation, which are herein considered as
entirely transcribed.
To find out about the gas category and technical specifications, refer to operation data and general features specified in the previous pages.
DANGER
Accessories and spare parts for installation and service procedures are to be supplied by the Manufacturer.
Should non original accessories and spare parts be employed, boiler proper performance is not guaranteed.
3.1.1
Packaging
The boiler is delivered packed in a robust cardboard box, fixed on a wooden pallet.
Remove boiler from cardboard box and check its integrity.
The packing materials can be recycled. Disposal must be managed via appropriate waste collection sites.
Keep packaging out of reach of children, as it may be dangerous.
The manufacturer shall not be held responsible in case of damage to people, animals, or property due to failure in following the above
mentioned information.
Packaging includes:
• the hydraulic kit with copper pipes for boiler connection to gas mains;
• the hydraulic kit with copper pipes for boiler connection to the heating system;
• the hydraulic kit with copper pipes for boiler connection to DHW system;
• gas shut-off cock;
• cold water shut-off cock;
• two wall brackets.
• 2 double screw treads with relevant dowels and 4 M8 nuts to fix the two brackets to the wall.
• a silicon tube for CH safety valve drain.
• a silicon tube and a fitting for DHW safety valve drain.
• a flue gas closing cap.
• a bag containing:
» the present boiler installation, use and maintenance manual;
» the template for mounting the boiler on a wall (see Fig. 6 Paper template).
Summary of Contents for ITACA KB 24
Page 42: ...42 Instructions for the installer Fig 6 Paper template ...
Page 79: ...79 ...