HCD1010A/W, HCD1010A/W, HCD1410A/W, HCD1410A/W
25
Fig. 23
22. Install shuttle switch.
§
Align holes with pins (Fig. 23.1) and depress switch
button (Fig. 23.2) to clear shuttle tab.
Fig. 24
23. Install shuttle drain tube and front feed water tube
(Fig. 24) .
Fig. 25
24. Install main housing insulation and shuttle insulation:
25. Apply a coat of petro gel to auger shaft.