Preparation
1 .
Remove all DS4-2P components from
the packaging.
2 .
Select an area to mount the control box.
Note:
The control box should be mounted to a
vertical wall. We recommend mounting the control
box at a height of
6 feet or less .
The chemical suction line must reach the bottom of
the chemical container. The bottom of the chemical
container should not be positioned higher than the
bottom of the control box.
3 .
Select the area where the stainless steel nozzle
assembly will be mounted.
Note:
Consider the foam pattern when selecting the
number of nozzles and location. The foam pattern
dimensions provided in this manual were measured
with nozzle assemblies mounted 6 inches (15 cm)
above the floor.
Area of coverage
Assembly
4 .
Attach the control box mounting feet to the back of
the control box, using the four screws provided in
the parts package.
5 .
Mount the control box to the wall using four of
the screws and plastic anchors provided in the parts
package.
Note:
Use a 5/16 inch drill bit to drill holes for the
plastic anchors.
V20190919
•
Page 8 of 15
Model: DS4-2P
3
Installation
DS4-2P
DS4-2P-2
DS4-2P-3
Area of
coverage
Up to 9 x 5
ft. (2.7 x 1.5
m)
Up to 8 x 4
ft. (2.4 x 1.2
m) at each
nozzle
Up to 6 x 3
ft. (1.8 x 0.9
m) at each
nozzle
6 feet
max
6 inches
3
2
Drills into wall
5
Control box
mounting feet
4
4
5
4
4
5
5
Drills into
box
Summary of Contents for DS4-2P Series
Page 16: ......