FMUSER INTERNATIONAL GROUP INC.
广州市汉婷生物技术开发有限公司
8
/
35
2.2.2 Environment Requirement
Item
Requirement
Machine Hall Space
Machine Hall Floor
Environment
Temperature
Relative
Humidity
Pressure
Door & Window
Wal
Fire Protection
Power
When user installs machine frame array in one machine hall,
the distance between 2 rows of machine frames should be
1.2~1.5m and the distance against wall should be no les
than 0.8m.
Electric Isolation, Dust Free
Volume resistivity of ground anti-static material:
1X10
7
~1X10
10
Ω
,
Grounding current limiting resistance: 1M
Ω
(Floor bearing should be greater than 450Kg/
㎡
)
5~40
℃
(sustainable )
,
0~45
℃
(short time)
,
installing air-conditioning is recommended
20%~80% sustainable 10%~90% short time
86~105KPa
Installing rubber strip for sealing door-gaps and dual level
glasses for window
It can be covered with wallpaper, or brightness less paint.
Fire alarm system and extinguisher
Requiring device power, air-conditioning power and lighting
power are independent to each other. Device power requires
AC 110V±10%, 50/60Hz or AC 220V±10%, 50/60Hz. Please
carefully check before running.
2.3 Wire’s Connection
Ø
Connecting Power Cord
User can insert one end into power supply socket, while insert the other end to
DC power.
Caution:
Before connecting power cord to FUTV3506 DVB-T2 Modulator, user should set
the power switch to “OFF”
.