www.fmiproducts.com
125526-01C
20
3. Position front left log against left side of
grate prongs (see Figure 29).
INSTALLATION
Continued
4. Position front right log against right side
of grate prongs (see Figure 30).
Figure 29 - Installing Front Left Log
Figure 30 - Installing Front Right Log
Front Left
Log
Front Right
Log
Grate
Prong
5. Place top left front log onto front left log.
Match the rectangular projection on top
of front left log with the rectangular hole
on the bottom of the top left front log. The
top left front log will rest on top of the front
left log (see Figure 31).
Figure 31 - Installing Top Left Front Log
Front Top
Left Log
Front Top
Right Log
Rectangular
Projection
Rectangular
Projection
Rectangular Hole
Underneath
Rectangular Hole
Underneath
Figure 32 - Installing Top Right Front Log
6. Place top right front log onto front right log.
Match the rectangular projection on top of
the front right log with the rectangular hole
on the bottom of of the top right front log
as shown in Figure 32. The top right front
log will rest on top of the front right log.
7. Place the middle log onto the ramp log as
shown in Figure 33, page 21. The middle
log has two tabs on the bottom to position
from left to right on the ramp log. The front
of the middle log should be touching the
front left and right top logs.