www.fmiproducts.com
125566-01C
25
INSTALLATION
Continued
Figure 51 - Installing Right Front Log
Figure 52 - Installing Left Front Log
Figure 53 - Installing Right Crossover
Log
Figure 54 - Installing Left Crossover Log
3. Place the right front log onto the base
and grate assembly as shown in Figure
51. The log has notches in the bottom
for the grate.
4. Place the left front log onto the base and
the right front log as shown in Figure 52.
The left front log has a notch on the bot-
tom that will line up with the projection
on the right front log.
5. Place the right crossover log onto the
rear log and the right front log as shown
in Figure 53. The right crossover log has
notches in the bottom that will line up
with the projections on the rear log and
the right front log.
6. Place the left crossover log onto the
rear log and the left front log as shown
in Figure 54. The left crossover log has
notches in the bottom that will line up
with the projections on the rear log and
the left front log.
Base
Assembly
Grate
Assembly
Left Front Log
Rectangular
Projection
Right Front Log
Right Crossover Log
Projections for
Sitting Log
Projection for
Sitting Log
Projection for
Sitting Log
Left Crossover Log