background image

 

 

 

 

 

 

4.

 

Needed Tools  

 

You will need the following tools in order to assemble your FLYING PHANTOM 

Essentiel

:   

1.

 

Flat wrench : 7, 8, 10, 17, et 19 mm 

2.

 

Hexagonal wrench CHC : M4, M5 et M6 

3.

 

Screwdriver and hexagonal screwdriver  

4.

 

Universal pliers 

5.

 

Tape measurer 5m 

6.

 

Torque measurer  

7.

 

Cable tensiometer  

8.

 

Angle measurer 

9.

 

Navy fat  

10.

 

Teflon or soapy water  

11.

 

Grey tape 

 

 

 

TOOLS 

Summary of Contents for Essentiel

Page 1: ...ASSEMBLING MANUAL...

Page 2: ...11 6 2 Trampoline 12 6 3 Platform Ropes Plan 17 7 Mast 18 7 1 Diamond 18 7 2 Cables 20 7 3 Haylards 22 7 4 Mast Setting 25 7 5 Mast Rotator 25 7 6 Cunningham 26 7 7 Trapezes 26 8 Bowsprit 28 8 Wings...

Page 3: ...ailing read carefully these two manuals and make sure that you have understood both contents Should you have any trouble or doubts please contact Phantom International via contact phantom internationa...

Page 4: ...4 2 Overview OVERVIEW...

Page 5: ...5 OVERVIEW...

Page 6: ...po tension rope T1115 1 Rope to fix the hook to the gennaker furler rope T1116 1 Gennaker winch rope T1117 1 Hook to catch the gennaker winch rope WD 2313 1 Mainsail cuningham strap PA1502 2 Mainsail...

Page 7: ...apeze control M2801 4 Trapeze handles M2703 4 Big box mast spreaders Shaft washer NFE25514 A4 4 9 125A4M4 12 Spreader lock M2601 2 Spreaders AG 31524 2 Junction piece spreader actuator AG 31530 2 Spre...

Page 8: ...Steering System Split ring bearing BF1216 4 Portside front helm tube cap BF1207b 1 Starboard front helm tube cap BF1207b 1 Portside rear helm tube cap BF1208b 1 Starboard rear helm tube cap Horizontal...

Page 9: ...YING PHANTOM Essentiel 1 Flat wrench 7 8 10 17 et 19 mm 2 Hexagonal wrench CHC M4 M5 et M6 3 Screwdriver and hexagonal screwdriver 4 Universal pliers 5 Tape measurer 5m 6 Torque measurer 7 Cable tensi...

Page 10: ...er fixation elements onto the axle against the inner p u s h p i n s 2 Complete both roller bearing units by clicking the pins into the pin holder Slide the roller bearing units onto the axle once the...

Page 11: ...loosen the dolphin striker stretch a thread between the two external bolts then screw back again the dolphin striker to reach a value of 4 5mm 3 Set the hulls in parallel and at the same height on th...

Page 12: ...e must increase the buoyancy reserve of each hull Compensate each Kg by increasing the buoyancy of one liter As an example if the onboard weight is of 200Kg one must increase the buoyancy reserve of 4...

Page 13: ...etween the back beam and the trampoline as shown here below Make sure you introduce the trampoline all the way to the end 7 Screw the bolts all the way tightly 8 After the first sailing session ensure...

Page 14: ...the worm screw to the bilge of the foil holding the nut underneath and pass the end around the same screw and the pulley 11 Strech the central rack T1115 rope thanks to rope T1109 Grey Dyneema 12 Ins...

Page 15: ...ng the rope fixing shackle gennaker furler rope T1116 Ensure that the rope of the gennaker furler goes under the other trampoline ropes and between the 2 lips of the groove as shown on the pictures 14...

Page 16: ...16 15 Install Main Sail tackle using the trailor axis PLATFORM...

Page 17: ...17 6 3 Platform Ropes Plan PLATFORM...

Page 18: ...oot and Big box rigging 2 Install the spreaders 3 Undo the mast foot 4 Install the Cables M1803 in diamond bronze M1902 the cable ending screw must be flush to the diamond bronze insert them inside th...

Page 19: ...of the mast 7 Put the cables on the spreaders and tighten screw 8 Make sure the mast is straight If not adjust using the threaded stem of the diamond cable by repeating the former procedure 9 Tighten...

Page 20: ...he cables with regard to the mast a shroud Str M3503 on each side and the Str M3405 forestay in the middle 4 Repeat the above procedure for the trapezes M2707 and M2708 5 Fix the trapezes on the side...

Page 21: ...e screw rearward to insert the forestay bar at the front of the boat 8 Mount the shrouds on the hulls with the Din 444 M 6 Nut Nylstop M6 screws 9 Adjust the shrouds to have about 180kg tension 10 Ave...

Page 22: ...ack down at the bottom of the mast see next page plan 5 For the strop of jib make a lark s head knot between M3406 rope and the pulley H404 see below attach the other end to the hound using a lork s h...

Page 23: ...23 MAST MAST...

Page 24: ...24 MAST...

Page 25: ...2 Fully unscrew the three chainplates 3 Enter the mast foot in the mast ball with a 90 angle 4 Raise the mast 5 Then hang the bridle to the bigger chainplates on the hulls 7 5 Mast Rotator 1 Take the...

Page 26: ...st 3 Hitch up the three pulleys HK404 to the mast foot with rope M1103 7 7 Trapezes 4 Install the trapeze elastics M2706 et M2705 from the pack Big box trapeze going through the hulls grommets Do a si...

Page 27: ...27 MAST...

Page 28: ...TG1104 without stretching them 5 Fix the bowsprit to the tube of the forestay through the screw eye DIN944 6 Fix the forestay tube to the forestay unscrewing the nut 7 Adjust the front flanges so tha...

Page 29: ...29 BOWSPRIT...

Page 30: ...30 11 Preinstall the jib cunningham as shown in the drawing herebelow thanks to ropes TG1102 and TG1103 and to the two pulleys HK404 fitted on textiles shackles BOWSPRIT...

Page 31: ...e four tubes and the connecting pieces in aluminium forward oblique edge Ref W1013 and aft straight edge Ref W1014 2 To assemble the tubes start connecting the central tube with the forward tube and t...

Page 32: ...e of the central tube in the aft connecting piece and proceed the same way with the external tube and the forward tube 4 Finish assembling the platform 5 Lay the trampoline on the platform Lace the te...

Page 33: ...o trampoline eyelets with the W1025 strings These snap hooks will be used to hang the strings coming out of the forward beams Mainsail cunni and jib sheet Insert the string into the ring of the textil...

Page 34: ...a knot for example half hitch Insert the black rubber band into the strap and around the tube in order to catch the slack of the strap when it is not used 9 Insert the wings into the beams Make sure y...

Page 35: ...35 9 Rudders 3 1 Crossbar 1 Please have the Big box Steering system pack 2 Assemble the rudders in the corresponding rudder boxes 3 Assemble the rudder boxes in the corresponding gudgeons RUDDERS...

Page 36: ...ise the rear of the boat so that you can low down the rudders of about 80 centimeters Measure the distance between the two leading edges of the rudders on same height do the same for the trailing edge...

Page 37: ...ackles 3 Raise the Main Sail 4 Pass the main Cunningham double block rope in the HK404 sail pulley and fix it to the mushroom head button at the foot of the mast To lower the sail after unfastening th...

Page 38: ...ackle on the forestay bar 3 Hook the jib to the shackle and raise the jib 4 Pass the TG1103 rope through the HK404 pulley of the jib halyard Pass the rope through HK404 pulley of the bowsprit saddle t...

Page 39: ...ar 3 Attach the furler disc at the end of the pole attach the gennaker head to the SP1305 halyard using the corresponding shackle Big box mast ropes 4 Pass the furler rope through the disc 5 Attach to...

Page 40: ...40 11 Foils Foils are mounted by simple insertion dragging them from the top to the bottom in the hulls through the holds of foils Latest version updated 29th May 2018 FOILS...

Reviews: