11
6.
Platform
6.1.
Hulls
1.
Introduce some navy fat in the inserts.
2.
Pre-arch of the front beam: loosen the dolphin striker, stretch a thread between the two
external bolts then screw back again the dolphin striker to reach a value of 4-5mm.
3.
Set the hulls in parallel and at the same height on the chocks.
4.
Be sure that the internal reinforcements are well positioned on the beams.
PLATFORM
Summary of Contents for Essentiel
Page 1: ...ASSEMBLING MANUAL...
Page 4: ...4 2 Overview OVERVIEW...
Page 5: ...5 OVERVIEW...
Page 16: ...16 15 Install Main Sail tackle using the trailor axis PLATFORM...
Page 17: ...17 6 3 Platform Ropes Plan PLATFORM...
Page 23: ...23 MAST MAST...
Page 24: ...24 MAST...
Page 27: ...27 MAST...
Page 29: ...29 BOWSPRIT...