TRIKE FLASH CRUISER - USER MANUAL REL . 2.09-ENG
___________________________________________________________________________
©
Copyright by
FLY
Products
s.r.l.
Page
5
Drilling of the motor support
If the trike is required to mount a certain type of engine, we provide for the factory
preparation for drilling and preparation for the indicated motor housing.
To allow the purchaser to mount a different motor model, always preferably a double
circle, we omit the drilling of the frame and it is therefore necessary to proceed initially
with this operation as follows:
Necessary tools to operate:
-
Drill
-
Metal drill points mm Ø 8 - Ø 10 - Ø 12
-
Hammer
-
Rivet Ø 3 mm + riveter
The motor support column is supplied already pre-drilled based on the “STANDARD”
engine guard models, insert it in the special support until the holes of the desired size
mate and lock them with the riveting tool with a 3 mm rivet.