FLTR Tekleen GB6-B User Manual Download Page 4

TABLE OF CONTENTS 

SECTION I:  INTRODUCTION  

 1 

SECTION II:  INSTALLATION  

 1 

SECTION III:  HEADER SETTINGS  

    1 

SECTION IV:  FRONT PANEL CONTROLS & SETTINGS      

  2 

4.1 

Status Screen 

 3 

4.2 

PD Set Point    

 3 

4.3 

Backwash Time  

 3 

4.4 

Dwell Time  

4.5 

Periodic Time   

 4 

4.6 

PD Delay Time  

 4 

4.7 

Controller Configuration/Flush Cycle Counter 

 4 

4.8 

Differential Pressure Setting    

 5 

SECTION V:  USER CONNCECTIONS   

5.1 PD  

5.2 Valves 

SECTION VI: GENERAL NOTES

6.1 Installation  

6.2 Battery Power Supply  

Warranty 

  7

For more information:
WEB: FLTR.com.au   PHONE: (+61) 1300 62 4020   EMAIL:  [email protected]   SKYPE: Purple.Engineering

Summary of Contents for Tekleen GB6-B

Page 1: ...co I c o co 9...

Page 2: ...he d p gauge should be mounted such that the blue fitting is closest to the ground to prevent shorting of the contact points in the event of a water leak If the filter outlet discharges to a tank or t...

Page 3: ...GB6 B USERS MANUAL For more information WEB FLTR com au PHONE 61 1300 62 4020 EMAIL info FLTR com au SKYPE Purple Engineering...

Page 4: ...Time 3 4 4 Dwell Time 3 4 5 Periodic Time 4 4 6 PD Delay Time 4 4 7 Controller Configuration Flush Cycle Counter 4 4 8 Differential Pressure Setting 5 SECTION V USER CONNCECTIONS 5 5 1 PD 5 5 2 Valves...

Page 5: ...re tubing The pressure differential PD gauge switch is to be installed on the bottom of the controller housing with the blue fitting closest to the ground The tubing from the high pressure connection...

Page 6: ...ill go to sleep after 90 seconds of inactivity but the controller will remain fully operational See Figure 2 below for further details Figure 2 Controller Front Panel Main Display Reset Button recesse...

Page 7: ...set the duration of the backwash per filter Press SEL and the ADJ or ADJ to set the value It is recommended that the user set this value in a range of 4 to 12 seconds 4 4 Dwell Time This setting is on...

Page 8: ...recommended that the user set this value in a range of 3 to 5 seconds 4 7 Controller Configuration Flush Cycle Counter This display will reflect the Header Setting initiated in Section III above and...

Page 9: ...nnecting the PD gauge and solenoids Figure 3 User Connection Terminals 5 1 PD These are the terminals for the PD gauge Polarity is not important The gauge should be mounted such that the blue fitting...

Page 10: ...g out the terminals 6 2 Battery Power Supply Under normal operating conditions the GB6 B s batteries will last for approximately 10 000 actuations of a latching solenoid Ambient temperature environmen...

Page 11: ...For more information WEB FLTR com au PHONE 61 1300 62 4020 EMAIL info FLTR com au SKYPE Purple Engineering...

Reviews: