25
Commissioning Procedure
1. Check that the conductivity transmitter is wired in accordance with the wiring diagram
(
Fig. 11, 12
, page 20, 21).
2. Make sure that the mains voltage is the same as indicated on the name plate.
Checking electrical connection
Apply mains voltage.
Applying mains voltage
Note
To remedy malfunctions that might occur during the commissioning procedure see
chapter “Systematic malfunction analysis” on page 28 – 29.