16
Examples of Installation
G
E
S
T
R
A
S
te
a
m
S
ys
te
m
s
G
E
S
T
R
A
S
te
a
m
S
ys
te
m
s
G
E
S
T
R
A
LR
G
T
....
G
E
S
T
R
A
LR
G
T
µ
S
-p
p
m
NW
LW
NB
A
Fig. 7
Conductivity monitoring, direct installation of conductivity transmitter via lateral flanged connection
Conductivity monitoring and continuous blowdown control, direct installation of conductivity trans-
mitter via measuring pot and connection of a continuous blowdown valve
Fig. 8
NW
LW
NB
A
G
E
S
T
R
A
S
te
a
m
S
ys
te
m
s
G
E
S
T
R
A
S
te
a
m
S
ys
te
m
s
G
E
S
T
R
A
LR
G
T
....
G
E
S
T
R
A
LR
G
T
µ
S
-p
p
m
LRGT 16-1
LRGT 16-2
LRGT 17-1
4
A
4 5
6 8 A
~ 250
415
336
1" BSP
EN ISO 228-1
R*
~ 250
600
336
1" BSP
EN ISO 228-1
R*
197
DN
[mm]
A
[mm]
15
182
20
184
25
184
40
189
R*: LRGT 16-1, LRGT 17-1 R = 30 mm
LRGT 16-2
R = 60 mm
LRGT 16-1
LRGT 16-2
LRGT 17-1
R*: LRGT 16-1, LRGT 17-1 R = 30 mm
LRGT 16-2
R = 60 mm