IPS Detect
Page 9 of 35
OIM_FLS_IPS Detect_EN_14
Subject to technical changes!
FLOWSERVE
5. Pull back the cable in order to remove any excess from within the terminal head.
Subsequently tighten the cable gland.
Picture: Connected cable
Picture: Cable inside of the housing
6. Replace the gasket ensuring that it does not cover the LEDs and then tighten with
the two screws.
Picture: Sensor gasket
4.2 Electrical connection check
Perform the following checks after completing electrical installation of the device.
Is the connection in accordance with the description?
Is the cable gland firmly tightened?
Is the fitting of the gasket correct and the LEDs clearly visible?
Are the housing cover screws tightened correctly?
-up once the electrical supply is (re) connected.
Summary of Contents for IPS Detect
Page 25: ...IPS Detect Page 25 of 35 OIM_FLS_IPS Detect_EN_14 Subject to technical changes FLOWSERVE...
Page 26: ...IPS Detect Page 26 of 35 OIM_FLS_IPS Detect_EN_14 Subject to technical changes FLOWSERVE...
Page 28: ...IPS Detect Page 28 of 35 OIM_FLS_IPS Detect_EN_14 Subject to technical changes FLOWSERVE...
Page 30: ...IPS Detect Page 30 of 35 OIM_FLS_IPS Detect_EN_14 Subject to technical changes FLOWSERVE...
Page 31: ...IPS Detect Page 31 of 35 OIM_FLS_IPS Detect_EN_14 Subject to technical changes FLOWSERVE...
Page 32: ...IPS Detect Page 32 of 35 OIM_FLS_IPS Detect_EN_14 Subject to technical changes FLOWSERVE...