![FlowMotion 2001V Series Installation And Operation Manual Download Page 13](http://html.mh-extra.com/html/flowmotion/2001v-series/2001v-series_installation-and-operation-manual_2308326013.webp)
4. Loop tubing around roller assembly between guides as
shown. Remove slack in tubing while rotating roller
assembly and sliding onto collet.
5. Align marks on tubing with outside edge of the tubing
clamp.
6. Reinstall collet screw firmly.
Tubing seal size
varies with the
selected tubing size.
See tables on
following pages for
details
Mark an 11 inch
length of tubing
and locate the
marks at the
outside edge of
the tubing seal
(see arrows)
Summary of Contents for 2001V Series
Page 1: ...2001V Series Peristaltic Chemical Feed Pump ...
Page 2: ......