
|
12
LM900006 Rev 0_3
Electrical (continued)
Step
Five
CHANGING FROM 120 TO 240 VAC:
1. Remove the two screws from the top of the printed circuit board
(PCB) and gently slide the PCB from the housing. Use caution
when removing the PCB.
2. Located jumpers JWA, JWB and JWC on the PCB.
3. To change to 240 VAC, remove jumpers from JWB and JWC
and place a single jumper across JWA. To change to 120
VAC, remove jumper JWA and place jumpers across JWB and
JWC.
4. Gently return PCB into housing and replace the two screws.
120 VAC
240 VAC
Configuration
Configuration
RELAY LATCH LOGIC TABLE:
With Latch ON, the relay will actuate when INPUT 1Aand INPUT 1B are in the same condition. The relay will
not change its condition until both inputs reverse their state.
Invert Off
Latch ON
Input 1A
Input 1B
Relay
ON
OFF
ON
OFF
ON
ON
OFF
OFF
ON
No Change
No Change
OFF
Invert ON
Latch ON
Input 1A
Input 1B
Relay
ON
OFF
ON
OFF
ON
ON
OFF
OFF
OFF
No Change
No Change
ON
The example shown below has the Invert Off and the Latch ON. With Invert ON, follow the above left chart.
Note: Some sensors (particularly buoyancy sensors) may have their own inverting capability (wired NO or
NC). This will change the logic of the invert switch. Check your system design.
With Latch OFF, the relay will
actuate only from INPUT 1A and
INPUT 1B will be ignored.
Invert Off
Latch Off
Input 1A
Input 1B
Relay
ON
OFF
No Effect
No Effect
ON
OFF
Invert ON
Latch Off
Input 1A
Input 1B
Relay
ON
OFF
No Effect
No Effect
OFF
ON