background image

 

www.flowair.com | 17 

5.  Operation | Werking 

 

§

  It is forbidden to place any objects on the unit. 

§

 

It  is  not  allowed  to  make  any  modification  in  the  unit.  Any 
modification causes in warranty loss  

§

 

In  the  case  of  incorrect  operation  of  the  device  it  should  be 
switched off immediately. 

§

 

To  ensure  proper  operation  unit  should  be  inspected 
periodically (six months), during inspection is needed to 
clean  heat  recovery  exchangers.  Filters  need  to  be 
replaced according to the needs.  

§

 

For the time of performing inspection or cleaning unit, power 
supply should be disconnected. . 

§

 

Casing can be cleaned with water and mild detergents.

 

§

 

The manufacturer bears no responsibility for damage of 
the  water  heat  exchanger  resulting  from  freezing  of  the 
medium  in  the  exchanger.  To  protect  water  heater 
against  freezing  it  is  recommended  to  use  glycol 
solution as a heating medium.

 

 

 

§

  Het is niet toegestaan om voorwerpen op de unit te plaatsen. 

§

 

Het  is  niet  toegestaan  om  enige  vorm  van  modificaties  aan 
de  unit  aan  te  brengen.  Door  enige  vorm  van  modificatie 
vervalt de garantie.  

§

 

Schakel  de  unit  onmiddellijk  uit,  wanneer  deze  niet  correct 
werkt. 

§

 

Voor  een  correcte  werking  moet  de  unit  regelmatig 
worden  gecontroleerd  (om  de  zes  maanden),  waarbij  de 
warmtewisselaars  moeten  worden  gereinigd.  Filters 
moeten worden vervangen naar behoefte.  

§

 

Onderbreek  altijd  eerst  de  stroomvoorziening  voor  u  de  unit 
gaat inspecteren of reinigen. . 

§

 

De  behuizing  kan  worden  gereinigd  met  water  en  een  mild 
reinigingsmiddel.

 

§

 

De fabrikant aanvaardt geen enkele verantwoordelijkheid 
voor  schade  aan  de  waterwarmtewisselaar  als  gevolg 
van  bevriezing  van  het  medium  in  de  warmtewisselaar. 
Om  te  voorkomen  dat  het  waterverwarmingselement 
bevriest,  verdient  het  aanbeveling  een  glycoloplossing 
als verwarmingsmedium te gebruiken.

 

 

5.1.  Filters replacement | Filters vervangen 

 

 

 

It is necessary to check filter 

condition every half year. 

 Het is noodzakelijk om de toestand 

van het filter regelmatig, elk half jaar, te 
controleren. 

5.2.  Heat recovery exchanger cleaning | Reinigen van de kruisstroomwarmtewisselaar 

 

 

 

 

Heat recovery exchanger should be cleaned with 

pressured air along lamellas.  

Be careful not to damage the aluminium lamellas. 

 

De lamellen van de kruisstroom warmtewisselaar moet 

worden gereinigd met perslucht.  

Zorg ervoor dat de aluminium lamellen daarbij niet 
beschadigd worden. 

 

 

 

 

Summary of Contents for OXeN X2-N-1.2-H

Page 1: ...1 www flowair com USER MANUAL GEBRUIKERSHANDLEIDING ...

Page 2: ...isies en wijzigingen in de gebruiksaanwijzing aan te brengen en ook modificaties aan het apparaat aan te brengen zonder de werking ervan te beïnvloeden Deze gebruiksaanwijzing is een integraal onderdeel van het apparaat en het moet bij het apparaat aan de gebruiker worden meegeleverd Lees voor een correcte werking van het apparaat deze gebruiksaanwijzing grondig door en bewaar de gebruiksaanwijzin...

Page 3: ...nal touch panel Extern aanraakscherm T Box regeling Anti freeze protection heat recovery exchanger Bevriezingsbescherming warmteterugwin warmtewisselaar Decrease of supplying air volume Afname van aanvoerluchthoeveelheid Anti freeze protection water heat exchanger Bevriezingsbescherming waterwarmtewisselaar Temperatuur van inlaatlucht en verwarmingsmedium wordt gemeten met een PT 1000 sensor Suppl...

Page 4: ...aatwatertemperatuur Qw water flow rate waterstroming in de warmtewisselaar Δpw pressure drop of water waterdrukval in de warmtewisselaar 2 2 Condensed water Condenswater Air parameters supply air RH 90 exhaust air RH 50 air volume 1200 m 3 h T1 outside temperature T2 inside temperature Luchtparameters RV inlaatlucht 90 RV uitlaatlucht 50 luchthoeveelheid 1 200 m 3 uur T1 buitenluchttemperatuur T2 ...

Page 5: ...mteterugwin vermogen Pc totale verwarmingscapaciteit Tw1 inlaatwatertemperatuur Tw2 uitlaatwatertemperatuur 1 Specificeer de temperatuur buiten 2 Specificeer de temperatuur binnen 3 Bepaal het warmteterugwin vermogen Pr is de totale verwarmingscapaciteit voor X2 N 1 2 4 Specificeer de parameters voor het verwarmingsmedium 5 Bepaal de totale verwarmingscapaciteit Pc reg OXeN met waterwarmtewisselaa...

Page 6: ...ttemperatuur van OXeN X2 N 1 2 T4 uitlaatluchttemperatuur van OXeN X2 W 1 2 Tw1 inlaatwatertemperatuur Tw2 uitlaatwatertemperatuur 1 Specifieke temperatuur buiten 2 Specificeer de temperatuur binnen 3 Bepaal de uitlaatluchttemperatuur is de uiteindelijke temperatuur voor OXeN X2 N 1 2 4 Specificeer de parameters voor het verwarmingsmedium 5 Bepaal de uitlaatluchttemperatuur van OXeN X2 W 1 2 T2 in...

Page 7: ... wall Installatie op de muur Drill ventilation opening and installation holes Mounting hole shall be prepared according to Building Regulations Boor de ventilatiesparing en de installatiegaten Neem bij het maken van de sparing voor de doorvoer de bouwvoorschriften in acht Dismount OXeN side covers and screw unit to the wall Bolts are not included Demonteer de zijkappen van de OXeN en bevestig de u...

Page 8: ... is recommended to check water connection and heating pipeline tightness While screwing exchanger to pipeline connecting stubs must be hold by wrench Met betrekking tot OXeN X2 W 1 2 V H De aansluiting moet zodanig worden gemaakt dat daardoor nergens mechanische spanning ontstaat Het systeem moet zodanig worden gemonteerd dat bij een storing de unit kan worden gedemonteerd Het is daarom verstandig...

Page 9: ...ling door te voeren Put on the side cover Plaats de zijkap 3 4 OxS intake exhauster installation Installatie aanzuig uitblaascombinatie OxS Prepare proper length of OxC transition Max wall thickness of 190 mm with a greater wall thickness must be used several pieces OXC Maak de OxC muurdoorvoer op maat De maximale muurdikte is 190 mm bij een grotere muurdikte moeten meerdere OXC muurdoorvoeren wor...

Page 10: ...uiten op de OXeN en dicht de verbinding af met een weinig uitzettend schuim of siliconenkit Dismount installation frame and side grill Demonteer het installatieframe en de grille aan de zijkant Screw frame and seal the connection with low expansion foam or silicone Bevestig het frame op de muur en dicht de naad af met weinig uitzettend schuim of siliconenkit ...

Page 11: ... OxS OxC rys B It is necessary to do tight conecion between OxS and OxC pic B Installeer de OxS op het bevestigde frame De aansluiting tussen de OxS en de OxC fig B moet luchtdicht zijn De aansluiting van de OxS op de OxC moet luchtdicht zijn fig B Install side grill Monteer de grille aan de zijkant ...

Page 12: ... voor OxS Hiermee kunt u de afblaas openeing verder van de aanzuig opening monteren Er kunnen max 4 elementen worden gekoppeld Dit kan nodig zijn in het geval van bijvoorbeeld uitmondingen van andere toestellen apparaten Dismount side duct Demonteer het kanaal aan de zijkant OxS should be installed on the frame already De OxS moet al op het frame zijn geïnstalleerd ...

Page 13: ...OxE expander Max number of OxE expanders is 4 pcs Installeer verlengstuk OxE Er mogen maximaal vier verlengstukken OxE aan elkaar worden geïnstalleerd Install side duct and grill Installeer het kanaal aan de zijkant en de grille ...

Page 14: ...iling and seal OxeN can t carry the load of OxH Installeer de unit met de montagebeugels Draadstangen min Ø 8 mm Installeer de OxE H onder het plafond en dicht deze af De OxeN unit is niet geschikt om de OxH af te steunen During ventilation and heat recovery process condensate can appear condensate pump remove it automatically by outlet on the top side of unit sensor condensate pump connecting tub...

Page 15: ...min 3x0 5 mm 2 max 50 m Systeem met een unit De T Box moet ongeveer 1 5 m boven de vloer op een goed geventileerde plaats worden geïnstalleerd Installeer de thermostaat niet in de buurt van warmtebronnen lampen ramen of deuren COLD OXeN X2 N 1 2 V H zonder extra luchtverwarmingselement HOT OXeN X2 W 1 2 V H met extra verwarmingselement Adres van de unit instellen Elke unit moet een uniek nummer he...

Page 16: ...ply check the correctness of connection of the fan motor and the controllers These connections should be executed in accordance with their technical documentation Before connecting the power supply check whether the mains voltage is in accordance with the voltage on the unit data plate The electrical system supplying the fan motor should be additionally protected with a circuit breaker against the...

Page 17: ... unit onmiddellijk uit wanneer deze niet correct werkt Voor een correcte werking moet de unit regelmatig worden gecontroleerd om de zes maanden waarbij de warmtewisselaars moeten worden gereinigd Filters moeten worden vervangen naar behoefte Onderbreek altijd eerst de stroomvoorziening voor u de unit gaat inspecteren of reinigen De behuizing kan worden gereinigd met water en een mild reinigingsmid...

Page 18: ...tievoorwaarden en beperkingen De garantie geldt voor een periode van 24 opeenvolgende maanden vanaf de datum van aankoop De garantie geldt alleen voor onderdelen De garantie is alleen geldig op Nederlands grondgebied zie algemene verkoop en leveringsvoorwaarden op www drl products nl Neem bij storingen in de werking van de unit contact op met uw installateur De fabrikant aanvaardt geen verantwoord...

Page 19: ... Equipment LVD 4 2009 125 WE Energie gerelateerde producten Energy related Products en geharmoniseerde normen met de bovenstaande richtlijnen and harmonized norms with above directives PN EN ISO 12100 2012 Veiligheid van Machines Basisbegrippen voor ontwerp Risicobeoordeling en risicoreductie Safety Of Machinery General Principles For Design Risk Assessment And Risk Reduction PN EN 60204 1 2010 Ve...

Page 20: ...20 www flowair com ...

Reviews: