Flow-Tek 19-CL 150 Series Installation & Maintenance Manual Download Page 8

Installation and Maintenance Manual

Series 19 - Segmented Ball Valves 

Date: Feb 2013 / Page 14 of 19

Installation and Maintenance Manual

Series 19 - Segmented Ball Valves

 Date: Feb 2013 / Page 15 of 19

®

®

A Subsidiary of BRAY INTERNATIONAL, Inc.

A Subsidiary of BRAY INTERNATIONAL, Inc.

FLOW-TEK, Inc. 

Tel: 832.912.2300 

© 2012 Flow-Tek, Inc. 

8323 N. Eldridge Pkwy #100 

Fax: 832.912.2301

Houston, Texas 77041 

www.flow-tek.com

FLOW-TEK, Inc. 

Tel: 832.912.2300 

© 2012 Flow-Tek, Inc. 

8323 N. Eldridge Pkwy #100 

Fax: 832.912.2301

Houston, Texas 77041 

www.flow-tek.com

11. DISASSEMBLY AND REASSEMBLY

11.1 Removing Actuator from Body

1.  Refer  to  relevant  actuator  installation,  operation,  and 

maintenance instructions, and proceed.

2.  Support  the  actuator  assembly  before  disconnecting  it 

from the body assembly.

3.  Remove  mounting  bracket  bolts  from  body  and  lift 

actuator assembly off stem.

11.2 Dismantling the Valve

Refer to parts listing on pg. 18 & 19.

1.  Turn the valve into the closed position and remove from 

pipeline.

2.  Place the valve on a flat surface with seat retainer (2A) 

facing up.

3.  Loosen  the  screwed-in  seat  retainer  (2A)  by  turning  it 

counterclockwise  and  removing  it  from  the  body  (1) 
along  with  the  retainer  O-rings  (4A,  4B).  (A  special 
cross-wrench tool may be ordered from the factory).

4.  Once the seat retainer is removed, remove the seat (2), 

wave  springs  (3)  and  shims  (3A)  along  with  the  seat 
O-ring (4).

5.  Remove  the  gland  retainer  (15)  by  removing  both 

packing nuts (18) (Removing the packing studs (16) is 
not necessary).

6.  Remove the post cover (20) by dismantling the post cover 

nuts (23) and pushing with Screwdriver.

7.  Drive both the stem and end post pins(10, 11) into the 

center of the stem and post until the outward end of the 
pin clears the segment (5). Be careful not to damage the 
stem or post. The pins can then be punched out of the 
stem and post when they are removed from the valve. 
Carefully remove post cove (20) and the gasket (19) and 
finally  the  post  (9).  (Inserting  a  bolt  in  the  jack  screw 
hole, tapped in the post, will help in removing the post).

8.  Remove the stem (8) by pushing it out through the post 

end of the body.

CAUTION:

 Take special care to not damage the splined 

end of valve stem during disassembly.

Figure 11

Removing the retainer with special tool

Both pins are driven inside before dismantling

9.  Rotate the segment (5) inside the body so the non-splined end of the 

segment is toward the downstream port of the valve and remove the 
segment straight out of the body.

CAUTION:

 

Be  extremely  careful  not  to  gall  or  scratch  the  sealing 

surface  of  the  segment  when  removing  it  from  body.  Scratches  may 
later cause excessive leakage and seal wear.

APPENDIX - B

CLASS 600

Figure 12

Summary of Contents for 19-CL 150 Series

Page 1: ...INSTALLATION MAINTENANCE MANUAL Series 19 CL 150 300 600 Segmented Ball valve Size 1 DN25 thru 12 DN300...

Page 2: ...assist in the unpacking installation and maintenance as required for Flow Tekproducts Productusersandmaintenancepersonnel should thoroughly review this manual prior to installing operating or perform...

Page 3: ...use straps through valve body Take care to position lifting straps to avoid damage to the tubing and mounted accessories WARNING Never lift the valve or valve package by the actuator positioner limit...

Page 4: ...Bolting Specifications Size in ANSI CLASS RATINGS Bolt Length mm 2 Torque N m 1 Low Strength Intermediate Strength 1 150 65 31 82 300 75 63 165 600 90 80 3 63 165 1 150 70 31 82 300 90 110 295 600 11...

Page 5: ...dle to ensure that the seat 2 is correctly placed and can move freely 9 3 Dismantling the Valve See Pg 10 diagrams U Turn the valve into the closed position U Removetheglandretainer 15 byremovingbothp...

Page 6: ...9 U Install the post cover 20 with gasket 19 and tighten the nuts 23 as per Table 3 U Slide thrust washer 12 packing 13 and gland ring 14 over the double D end of the stem 8 and into packing box bore...

Page 7: ...T O RING 5 SEGMENT 6 STEM BEARING 7 POST BEARING 8 STEM 9 END POST 10 STEM PIN 11 END POST PIN 12 THRUST WASHER 13 PACKING 14 GLAND RING 15 GLAND RETAINER 16 PACKING STUD 17 PACKING WASHER 18 PACKING...

Page 8: ...ay be ordered from the factory 4 Once the seat retainer is removed remove the seat 2 wave springs 3 and shims 3A along with the seat O ring 4 5 Remove the gland retainer 15 by removing both packing nu...

Page 9: ...acking box CAUTION Since the sealing on V ring packing takes place at the feather edge it is imperative to avoid damage to that edge 11 Reinstall the gland retainer 15 and packing nuts 18 and leave lo...

Page 10: ...T BEARING 8 STEM 9 END POST 10 STEM PIN 11 END POST PIN 12 THRUST WASHER 13 PACKING SET 13A PACKING SPACER 14 GLAND RING 15 GLAND RETAINER 16 PACKING STUD 17 PACKING WASHER 18 PACKING NUT 19 GASKET 20...

Reviews: