201261 D/GB
9
GB
4.0 Transport
ATTENTION! Always check delivery for completeness and damage!
The carrier (forwarder or railway) is to be informed immediately in case of transport damages.
(s. yellow leaflet)
5.0 Setting up the machine
The drill should be set up on a solid base and aligned using a spirit level. If the machine is to be bolted to the base,
ensure that the base plate does not warp in the process. Use of vibration damping elements is recommended.
6.0 Installation
The machine has been installed ready for use. Please check whether type of current, current voltage and fusing
agree with the prescribed values. There must be a protective ground terminal. Mains fusing 16 A.
Attention! Take notice of the right rotation (right-hand) of spindle
.
7.0 Commissioning
The parts with rust-inhibiting coating should be cleaned carefully. The column should then be lubricated. The table
should be moved several times since condensation may have formed in the table guide.
8.0 Operating and indication elements
(max. equipment) see figure 4.
1. main switch
2. polarity/reverse switch
3. drilling speed indicator / drilling depth indicator
4. switch drilling/tapping
5. emergency push button
6. coolant on/off
7. lighting on/off
9.0 Operating
For starting/stopping the machine switch on/off the main switch. Here to first unlock the emergency push button
(optional).
The electrical drill guard must be closed (safe position). If present use the polarity/reverse switch to select the right
speed level, now you can change from spindle speed step 1 (right-hand) into spindle speed step 1 (left-hand) e.g.
for tapping.
The switch drilling/tapping (option) selects the direction of the spindle, with the switch drilling/tapping (option)
choose the working process.
10.0 Speed indication
10.1 On machines
without
a digital speed indication the set speed will be shown on a scale at the shifting lever
Machines with variable speed drive are preadjusted to speed level 1.
10.2 On machines
with
a digital speed indication the set speed will be shown ex actly on the display (accuracy 10
rpm).
11.0 Speed change
11.1 On machines with a
variable - speed drive
open the hood (screw B), unmount indicator, clamping lever, shift
lever and left-hand hood (screw A). Untension the belt by unclamping the motor holder and switch belt to the
corresponding belt disc. Assembly in reve rse order. (s. diagram 5-6)
11.2 On machines with a
mechanical
infinitely variable - speed drive
change the speed by swivelling the shifting
lever (6) when the machine is running. (s. diagram 7)
11.3 On machines with a
electronical infinitely variable - speed drive
change the speed by turning the
potentiometer.
12.0 Drilling depth indication
12.1 On machines
without
a digital drilling depth indication the drilling depth is shown on a scale.
12.2 On machines
with
a digital drilling depth indication (3) the set drilling depth is shown digitally. (s. diagram 4)
Summary of Contents for M1 ST Series
Page 1: ...Werkzeugmaschinen Operating instructions Bedienungsanleitung M2 ST P23 ST P23 ST FB...
Page 14: ...201261D GB 13 1 1 1 2 2 2 3 3 3 4 4 4 5 5 5 6 6 6 7 7 7 8 8 8 9 9 9 10...
Page 15: ...201261 D GB 14 1 7 2 3 4 5 6 Abb fig 4...
Page 18: ...201261 D GB 17 P23 ST P23 ST mit Gewindeschneideinrichtung...
Page 19: ...201261 D GB 18 M2 ST P23 ST FB...
Page 36: ...201261D GB 15 1 1 1 2 2 2 3 3 3 4 4 4 5 5 5 6 6 6 7 7 7 8 8 8 9 9 9 10...
Page 37: ...201261 D GB 16 1 7 2 3 4 5 6 Abb fig 4...
Page 40: ...201261 D GB 19 P23 ST P23 ST mit Gewindeschneideinrichtung...
Page 41: ...201261 D GB 20 M2 ST P23 ST FB...