9
as the battery charge lasts. You may need to replace the
battery afterwards.
2.
If 115VAC power is ON, the charger/controller continues
to try to charge the battery at a charging rate of .5 AH
until the battery charge is more than 20%, at which
point the charger will resume charging at a rate of 2 AH.
3.
If the pump is running and the AC power is on, you may
need to stop the pump to allow the battery to charge.
Follow the battery manufacturer’s recommendations for
maintenance and safe use of the battery.
1.
Connect the
positive
(+) charger/controller lead wire
(red) to the
positive
(+) battery terminal (red). Connect
the
negative
(
–
) charger/controller lead wire (black) to
the
negative
(
–
) terminal (black) on the battery. If you
are using two batteries, use the set of optional terminals
and connect the second battery. Use lead wires (not
included) to connect the
positive
(+) charger/controller
terminal to the
positive
(+) battery terminal and the
negative
(
–
) charger/controller terminal to the
negative
(
–
) battery terminal.
2.
The backup pump leads are polarity sensitive; connect
the
positive pump lead to the terminal labeled Pump ‘+’
Wiring
•
Setup