Florence versatile 4C Depot Installation Manual Download Page 12

Page 12 of 16

4C Depot Installation Manual—206731—Rev C

www.florencemailboxes.com

APPENDIX A:  INSTALLING 4C MAILBOX 

INTO DEPOT CABINET

UNPACK THE 4C DEPOT CABINET

1 . 

Each 4C Depot cabinet will arrive packaged in a single cardboard carton held together by 

banding.

2 . 

Cut the banding and carefully remove the packaging from the 4C Depot cabinet.

3 . 

A package containing the hardware needed to install the 4C cabinet, including the 

mounting screws to mount the 4C mailbox into the 4C Depot cabinet, is taped inside the 

bottom of the cabinet (refer to 

“HARDWARE LIST” on p. 4

).

•  All of the included mounting screws in the 

K65734

 hardware kit may not be needed, 

depending on the size of the 4C Depot cabinet.

4 . 

Ensure the leveling feet on the 4C Depot cabinet are adjusted up all the way.

5 . 

Lay the 4C Depot cabinet on its back on a non-abrasive surface which will protect the 

finish on the cabinet.

CAUTION

•  Florence 4C units are heavy.  Use caution when lifting and carrying to avoid 

injury.

•  Pinch hazard exists when placing mailbox units into Depot cabinets.  Keep 

fingers and hands clear to avoid injury.

•  4C Depot with 4C mailbox installed is heavy.  Use two (2) or more people to 

move cabinets.  Use caution when lifting and carrying.  Failure to do so could 

result in serious injury.  Units must be braced or held in place until secured to 

the concrete.  Failure to do so could result in serious injury.

Be extremely careful not to scratch or damage the 

finish on the unit when removing the packaging.

Summary of Contents for versatile 4C Depot

Page 1: ...INSTALLATION MANUAL versatile 4C Depot Stand alone Cabinet...

Page 2: ...Florence 4C units are also front heavy when the master doors are open Units must be braced or held in place until secured to the concrete Failure to do so could result in serious injury GENERAL INFORM...

Page 3: ...ts are of aluminum construction with a durable powdercoat finish on all exposed exterior surfaces Each Depot cabinet has four 4 adjustable leveling feet for installation on uneven surfaces Each Depot...

Page 4: ...ed shoes Shop vacuum Broom Waterbased cleaner such as Simple Green Soft chamois HARDWARE LIST K214164 hardware kit consisting of the following items is included 1 K214163 kit which contains 15 206727...

Page 5: ...install the 4C cabinet is inside a compartment near the bottom of the 4C mailbox unit refer to HARDWARE LIST on p 4 4 Ensure the leveling feet on the 4C Depot cabinet are adjusted up all the way 5 Car...

Page 6: ...n the desired installation location 2 Remove the lower front panel from the cabinet Use the 2 square tip 1 4 hex shank insert driver bit supplied in the package of hardware placed into a cordless driv...

Page 7: ...unit is level You should only have to adjust 3 of the 4 leveling bolts The leveling bolt that remains unadjusted is the leveling bolt located in the highest spot on the concrete slab A 2 ft level wit...

Page 8: ...concrete pad Be sure both skirt plates are in place before drilling the holes in Step C to ensure that the mounting brackets are positioned in proper alignment C Use the 11 64 diameter drill bit 2067...

Page 9: ...C www florencemailboxes com D Secure each mounting bracket to the cabinet structural tube using six 6 10 32 x 1 2 self tapping Phillips head screws 206727 Front skirt plate removed for illustration cl...

Page 10: ...to Step 2 2 Move the cabinet out of the way to reveal the drill marks Finish each hole in the concrete by drilling to full depth 3 Move the cabinet back over the holes drilled into the concrete You on...

Page 11: ...tart of the installation 4C MAILBOX ACTIVATION BY USPS If the 4C Depot is to be serviced by the US Postal Service refer to the 4C Mailbox Installation Manual 206362 for specific instructions on Arrow...

Page 12: ...be needed depending on the size of the 4C Depot cabinet 4 Ensure the leveling feet on the 4C Depot cabinet are adjusted up all the way 5 Lay the 4C Depot cabinet on its back on a non abrasive surface...

Page 13: ...aster door until the hold open arm engages and install the included 8 18 x 1 1 4 pan head T20 Torx screws 65734 in all of the slots along the right hand outer frame B Partially open the left master do...

Page 14: ...ght hand outer frame Refer to the images in Steps 7 A and 7 C above C Install the included 8 18 x 1 1 4 pan head T20 Torx screws 65734 along the top and bottom frame Refer to the image in Step7 D abov...

Page 15: ...Page 15 of 16 4C Depot Installation Manual 206731 Rev C www florencemailboxes com This page intentionally left blank...

Page 16: ...Florence Corporation is part of the Gibraltar Industries family of companies www gibraltar1 com...

Reviews: