![Florence versatile 4C Depot Installation Manual Download Page 10](http://html1.mh-extra.com/html/florence/versatile-4c-depot/versatile-4c-depot_installation-manual_2307364010.webp)
Page 10 of 16
4C Depot Installation Manual—206731—Rev C
www.florencemailboxes.com
ANCHOR THE 4C DEPOT TO CONCRETE
1 .
With a hammer drill and 7/16” masonry bit, drill
holes through the anchor holes in each end of
the mounting brackets to a depth of 4 inches
into the concrete.
• If you successfully drill all four anchor holes
to full depth,
go to Step 6
.
• Otherwise, if you can’t apply enough
pressure on the drill to completely drill the
holes while positioned inside the cabinet,
just use the drill to mark the placement of
the holes on the concrete and
proceed to
Step 2.
2 .
Move the cabinet out of the way to reveal the
drill marks. Finish each hole in the concrete by
drilling to full depth.
3 .
Move the cabinet back over the holes drilled
into the concrete.
• You only need to align one hole in one of
the mounting brackets with the appropriate
hole in the concrete.
4 .
Install a single Tapcon® anchor bolt (
206725
)
with an impact driver and 3/4” socket, but do
not tighten all the way.
5 .
Rotate/pivot the cabinet around the single
previously installed anchor until the rest of the
holes in the mounting brackets align with the
holes drilled in the concrete.
6 .
Install Tapcon® anchor bolts (
206725
) into all of
the holes with an impact driver and 3/4” socket.
7 .
Ensure all anchor bolts are tight.
anchor holes
anchor bolt
anchor bolts