Summary of Contents for Beaver 250

Page 1: ...Beaver 250 Safety and Operators Manual Parts Listing 25 05 11 CAUTION Read the instruction manual before using the appliance Effective Date 11 11 10 ...

Page 2: ...Beaver 250 1800 356 673 1 1800 FLOOREX Notes Machine Purchased Owner ...

Page 3: ...ns 7 Operating instructions 8 Operating instructions 9 Floor Take up Procedure 10 Floor Take up Procedure 11 Problem solving 12 Parts Diagram Main 13 Parts List Main 14 Parts Diagram Handle 15 Parts List Handle 16 Wiring Diagram 17 This machine is designed to operate with the wheels in contact with the floor at all times Do not operate with the wheels off the floor ...

Page 4: ...Beaver 250 1800 356 673 3 1800 FLOOREX Specifications Beaver 250 Weight 91kg Dimensions 524 x 858 x 1114 width x Height x Length Rated Voltage 240 Volt 50 Hz Rated Watts 1500W Max Blade Width 250mm ...

Page 5: ...or 4 This equipment is intended for commercial use 5 For the operators safety and the safety of others always keep all guards and shrouds in place 6 Never start or run machine when unattended 7 This machine is intended for use on horizontal floor surfaces only 8 Never start or run machine with the handle folded 9 Do not lend or rent machine without the operating instructions for the machine and th...

Page 6: ...emely flammable and poisonous Petrol should only be dispensed in well ventilated areas and only when engine is cool 17 WARNING POISONOUS EXHAUST GASES Do not operate petrol powered equipment without adequate ventilation Carbon monoxide is and invisible odorless gas that can harm or can kill you 18 Do not operate BEAVER 250 with any covers or doors removed or open 19 The BEAVER 250 can produce soun...

Page 7: ... the machine from harm DO NOT alter or adjust the over load in any way If it is faulty only replace with original part that is identical to the faulty one 7 Never bypass over current devices in this machine 8 Never connect or disconnect power cables when the machine is on or with voltage present or while under load 9 Disconnect all power connections and observe lock out tag out procedures before a...

Page 8: ...uld cause a hazardous situation 5 Ensure there are no obstacles or existing structures that could present a hazard to the operator If so take necessary action to eliminate the hazard 6 Disconnect the power lead from the Beaver 250 before changing blades or accessories Failure to comply could result in bodily injury 7 Fold handle to the operating mode see operating mode on following page and lock i...

Page 9: ...Beaver 250 FLOOREX 1800 8 1800 356 673 Operating instructions ...

Page 10: ... such hazard Failure to comply could result in bodily injury and or could damage the machine or property 16 Ensure machine is on a level surface and handle is not folded see operation mode on the previous page 17 Hold the handles firmly and switch the machine on by moving the switch to the ON position 18 If the over load trips it indicates a problem Undersize power lead or poor power to GPO outlet...

Page 11: ...3 Floor Take up Procedure 1 Create strip to start from across the room 2 Working From the starting strip remove strips leaving 100 150mm of material between each strip 3 Work the other side of the starting strip to the other end of the room ...

Page 12: ...Beaver 250 1800 356 673 11 1800 FLOOREX Floor Take up Procedure 1 Use a full width blade to remove the remaining material ...

Page 13: ...ide down Often the blade has a single bevel on it and doing this changes the cutting angle on the blade Use a different blade type Blades come in different thickness for different jobs The material being removed comes up in big sheets making removal difficult to manage No carpet blade is installed Use a blade designed for carpet Carpet blades have a cutter on each side of the blade cutting the mat...

Page 14: ...Beaver 250 1800 356 673 13 1800 FLOOREX Parts Diagram Main ...

Page 15: ...Beaver 250 FLOOREX 1800 14 1800 356 673 Parts List Main ...

Page 16: ...Beaver 250 1800 356 673 15 1800 FLOOREX Parts Diagram Handle ...

Page 17: ...Beaver 250 FLOOREX 1800 16 1800 356 673 Parts List Handle ...

Page 18: ...Beaver 250 1800 356 673 17 1800 FLOOREX Wiring Diagram When Fitted ...

Page 19: ...plete supplier of all your concrete surface preparation needs Diamond grinders Dust extraction Shotblasters Screed mixers Diamonds Coating application Floor Scrapers FLOOREX PRODUCTS 156 Gray Street Swan Hill VIC 3585 Web www floorex com au Email sales floorex com au ...