background image

 SINCE 1981 

www.flofab.com

001-iom-2017-hwst

Hot Water 

Storage

Tanks

Series RLU/RWU/RSE

Operation, Maintenance

& Installation Manual

Summary of Contents for RLU series

Page 1: ...SINCE 1981 www flofab com 001 iom 2017 hwst Hot Water Storage Tanks Series RLU RWU RSE Operation Maintenance Installation Manual...

Page 2: ...ense before attempting any maintenance procedures 1 Steam 2 High Temperature or Boiler Water 3 Connected Energy Source 4 Connected Power Source 5 Pressurized System 6 Any Combination of the Above FLOF...

Page 3: ...arnings specific to the compo nent It is strongly recommended that each document be reviewed before attempting any installation or maintenance procedures Areas of potential danger 1 all inlet and outl...

Page 4: ...e of supporting the total weight of the tank when filled to capacity After the tank has been set in place and uncrated if necessary it should be carefully examined to assure that it was not damaged du...

Page 5: ...avoid possible injury or death Note For all piping connections the use and or type of joint compound or sealer on the joint should be determined by referring to local codes accepted practices or the r...

Page 6: ...use of the superior design and construction of FLOFAB Tanks very little is required in the way of inspection or maintenance The following table identifies the three 3 inspections that are recom mended...

Page 7: ...ces and use common sense before attempting any maintenance procedure 1 Steam 2 High Temperature or Boiler Water 3 Connected Energy Source 4 Connected Power Source 5 Pressurized Systems 6 Any Combinati...

Page 8: ...ng fitting 6 Break the joint at the fitting 7 Inspect both the threads of the fitting and the pipe for signs of damage If damage is found either rethread or replace the damaged component 8 If no damag...

Page 9: ...allow time for the tank its contents and all com ponents to cool 4 After assuring that steps 1 through 3 above have been completed and any other special circums tances present within the system have...

Page 10: ...orida USA 33467 5749 Toronto Canada Tel 1 647 544 2995 www flofab com SERVICE 24 7 parts flofab com Las Positas College 3000 Campus Hill Dr Livermore CA USA 94551 Baliscus 1075 Grand H ron Boul Saint...

Reviews: