Summary of Contents for VSD 3800
Page 2: ...Required Tools...
Page 9: ...1 E 1 D B A D C...
Page 10: ...IMPORTANT NOTE FRAME BEAMS MUST BE IN THIS ORIENTATION BEFORE CONTINUING FRONT REAR FRONT REAR...
Page 11: ...4 1 2 Alum Nylock Nuts 4 1 2 x 3 3 4 ss Bolts Torque to 25 ft lbs Contents for Step 2...
Page 13: ...NOTE BUTT CORNER POST TAB UP TO FRAME CLAMP 2 A 2 C 2 B...
Page 17: ...3 E 3 G 3 F...
Page 21: ...4 H...
Page 22: ...4 I ASSEMBLY CAUTION NOTE CABLE MUST BE ABOVE BOLT AFTER ASSEMBLY...
Page 24: ...Assembly of Step 5 5 A 5 B...
Page 26: ...5 E 5 D...
Page 27: ...5 F 5 G 5 H...
Page 28: ...5 I 5 J...
Page 29: ...5 K 5 L 5 M NOTE BETWEEN UHMW STRIP AND CORNER POST...
Page 32: ...Assembly of Step 6 6 A 6 B 6 C...
Page 48: ...VSD 5000 Pontoon Frame Exploded Views 1 2 LIFT P N 511 50085 02 VIEW 1 VIEW 2...
Page 49: ...VSD 5000 Pontoon Frame Exploded Views 3 6 LIFT P N 511 50085 02 VIEW 3 VIEW 4 VIEW 5 VIEW 6...
Page 50: ...VSD 5000 Pontoon Frame Exploded Views 7 10 LIFT P N 511 50085 02 VIEW 7 VIEW 8 VIEW 9 VIEW 10...
Page 51: ...VSD 5000 Pontoon Frame Exploded View 11 LIFT P N 511 50085 02 CORNER POSTS A B C D...
Page 54: ...NOTES...
Page 55: ...NOTES...
Page 56: ......