2
Floataway Installation Manual 230v 50Hz Tranquility 2017 - v3
Please read through all the instructions before beginning the installation. This first section
repeats the information which was supplied in our technical information for preparing the
float room for a Floataway Float Pool.
Before You Get Started
Page.
• First
check
the
room 3
• Inspect the proposed reception area.
3
• Plan where to put the salt and parts during the installation. 3
• Check the Cables / Electrical Supplies
4
The Installation : Sequence of Parts Required
Page
• The high temperature insulation panel
5
• The silicone heater membrane sheets
5
• The
heater
panels
5
• The
tub 5
• The ground noise isolation system
6
• The skimmer and pre-filter
7
• The
dome
7
• The
door
7
• The hinges (fitted to the door)
8
• The suction assembly and pump connections
9
• The filter connections and the back panel
9
• Water
Isolation
check 10
• The
jacks
/
door
motors
10
• The auto doser - liquid disinfectant
11
• The control box and its connections
14
• The control box diagrams
15
• The electrical supply cables
16
• The
water
level
sensor
17
• The
temperature
probe
17
• The
back-up
battery
17
• XLR
connectors
18
• Room
light
control
18
• Under
water
lights
19
• The
air
hose
connections
20
• Music
speaker 20
• Intercom
system
21
• Music
system 22
• Fitting
the
side
panels
22
• Identifying parts of the LAN cable
23
• The
remote
control
24
• Recommended
values
29
• The
water
and
salt
30
• Troubleshooting
common
problems 31
• Remote
Quick
Guide 33